The Advantages

The Advantages.

The advantages of the MMC system, in twenty-one categories. Each is summarised below, with its own deeper page. Outside figures are sourced. MMC figures are proposal figures from the model and component pages.

Twenty advantages.

01

Cost per km

One structure, standard parts and shared services against high-speed rail blowouts.

Deeper page: Economics

02

Modular components

Same parts on every km, made in volume: every km gets cheaper.

Deeper page →

03

Many services, one cost

Ten services on one structure instead of a corridor each.

Deeper page →

04

One global standard

Simpler implementation, less design time, fewer mistakes.

Deeper page →

05

Bespoke equipment

Purpose-built equipment and services to install land and undersea corridors.

Deeper page →

06

Local manufacturing

Most of every structure made where it is built.

Deeper page →

07

Electrify the world

Electric rail and maglev, off transport fuels.

Deeper page →

08

Safety and security

No level crossings, no track at ground level, fewer points to protect.

Deeper page →

09

Environment

Minimal footprint; the land stays in use.

Deeper page: Environmental

10

Rail-delivered construction

Rail for everything: components, crews and lifting.

Deeper page →

11

Uniting nations

Trade and tourism tie nations together.

Deeper page →

12

One global grid

HVDC links national grids for stability and flexibility.

Deeper page →

13

Out of poverty

Cheap transport and services for all; desert solar along the corridors.

Deeper page →

14

Calculated foundations

Precast caisson, no pile driving, no cure wait; tension inspected and renewed for life.

Deeper page →

15

Over and along existing corridors

Over roads, rail and rivers; along rail, road and transmission corridors. What runs underneath keeps running.

Deeper page →

16

Water security

Water carried to dry regions, opening land for farms and towns.

Deeper page →

17

Data centres in the desert

Desert solar, fibre and cooling water on one structure.

Deeper page →

18

New towns along the corridors

Every town site serviced from the start; growth spread inland.

Deeper page →

19

Low-cost fares

One buck around the world: freight and fixed services carry the cost of passenger travel.

Deeper page →

20

AI jobs and the debt bomb

One global build: work through the AI transition, and infrastructure that grows output.

Deeper page →

21

Economics

Cost savings and revenue streams: about 56% cheaper to build per km, and every service pays for use (estimate).

Deeper page →

Cost per km is the winning point.

High-speed rail is built as one-off projects, and the costs blow out. MMC is built from standard modular components and carries many services on one structure, so the cost of each km is shared.

HS2 · UK
£37.5 bn → £88–103 bn

First estimate £37.5 bn (2009 prices).1 The northern legs were cancelled in 2023. In May 2026 the cost to complete London–Birmingham alone was put at £87.7–102.7 bn (2025 prices), with first services in 2036–2039.2

California HSR
US$33.6 bn → US$126–231 bn

Phase 1 in the 2008 Business Plan (2008 dollars).3 The draft 2026 plan gives US$231.3 bn on legacy assumptions, or about US$126.2 bn after scope cuts.4

EU high-speed lines
+78%

Average cost overrun at line level across the lines audited by the European Court of Auditors; every line audited ran more than 25% over.5

Rail projects, worldwide
+44.7%

Average cost escalation on 58 rail projects, in a study of 258 transport projects.6

Per-km figures are derived (cost ÷ length). Price bases and scope differ between projects (stations, tunnels, rolling stock), so they are not like-for-like.

Cost per km, the deeper page →   Economics: cost savings and revenue streams →

Every km gets cheaper.

Every MMC km uses the same standard components, made in volume on one production line and installed by the same method. MMC is modular and one standard technology across the globe, so the cost per km falls as volume and repetition grow. The evidence from others:

The MMC parts.

MMC-DWG-000-01 The MMC Architecture
MMC-DWG-000-01 · The MMC Architecture: one foundation system, standard pylon joints, captured arms and beams.

One set of parts, seven models

Number of each part per pylon, at standard height. — not used. * assumed.

MMC-VCMMC-VCMMC-VBMMC-VBMMC-VAMMC-VAMMC-VDMMC-VDMMC-TBMMC-TBMMC-TB GuyedMMC-TB GuyedMMC-TAMMC-TA
Cutter head12221*1*2*
Anchor latch12221*1*2*
Caisson ring5*16*20*20*5*5*10*
Caisson head12221*1*2*
Tension tubular (~12 m)261286*6*12*
Pylon joint (~3 m)2*10*24*14*18*18*36*
Pylon cap————1*1*—
Tension lock12221*1*2*
Cross beam / cross-arm1253111
Longitudinal beam3102515———
HVDC arm—6126———
Aqueduct wall panel——2*————
Guy wire and anchor—————3—

Modular components, parts per km →

Modular components, the deeper page →

One structure instead of many corridors.

Ten services share one alignment, one land corridor, one set of foundations and one structure: maglev, freight rail, service rail, road, HVDC, water, gas and liquid fuels, hydrogen, fibre and hyperloop. Built separately, each needs its own corridor.

The Standard →

Many services, one cost, the deeper page →

Simpler implementation. Less design time. Fewer mistakes.

Nations choose from a fixed catalogue of MMC designs. They do not design new structures for each project. Design is done once and reused.

One network, every nation.

MMC World Network schematic
MMC World Network, schematic. Routes are indicative.

The World Network →

One global standard, the deeper page →

Purpose-built to install land and undersea corridors.

The standard comes with its own installation equipment and services, designed once for the MMC components and used on every corridor. This is the key: the same equipment, the same method and the same trained crews, km after km, nation after nation.

Construction drawings, set 003 →

Undersea Lanes →

Bespoke equipment and services, the deeper page →

Most of every structure is made where it is built.

A central Megafactory makes the precision parts: the skins, ribs and dies. Local Spoke stations inject the concrete using local aggregate and water. Finished heavy modules are not shipped across the world.

MMC-VB · concrete share
~95%

Of the ~1,421 t dead load per 25 m span, ~1,356 t is concrete (from the MMC-VB bill of materials). Derived.

Made locally
Concrete · labour · services

Concrete is injected at local Spokes. Installation crews, operation and maintenance are proposed to be local in each nation.

The concrete share is by mass, from the MMC-VB bill of materials (dead load, no trains). Local installation and operating services are the MMC proposal.

The Mega Factory Method →

Local manufacturing, the deeper page →

Electric transport, no transport fuels.

MMC carries electric rail and maglev on every corridor, powered by HVDC on the same structure. People and freight move without transport fuels: the MMC pathway to net zero for transport.

World oil
~2/3

Transport uses nearly two-thirds of world oil demand.17

Rail
8% · 7% · 2%

Rail carries 8% of the world's passengers and 7% of its freight on 2% of transport energy.18

Oil field decline
5.6% / yr

Average post-peak decline of conventional oil fields. Nearly 90% of upstream investment since 2019 has gone to offsetting decline.19

Australia · imports
79%

Share of refined fuels consumed in 2023–24 that were imported. Two refineries remain.20

Electrify the world, the deeper page →

Safer, easier to protect, and over what is already there.

A line on columns has no level crossings and no track at ground level for people, vehicles or animals to reach. It crosses roads, rail, rivers and farms without closing or rebuilding them.

Australia · level crossings
50

Deaths at level crossings on the Australian heavy rail network, 2016–2025: 33 in collisions with road vehicles, 17 with people. There were also 71 trespasser deaths.24

Australia · crossings in service
23,000+

Level crossings on Australia's rail network, per the national rail safety regulator. In 2022–23: 38 collisions, 5 deaths, 6 serious injuries.25

European Union · 2024
91%

Of 750 railway deaths (suicides excluded), 65.6% were trespassers and 25.5% were level crossing users: people on the track at ground level.26

Near hits · Australia
7,445

Near hits at level crossings on the Australian heavy rail network, 2016–2023.27

Security: fewer points to protect.

The French and German attacks hit cables in lineside troughs at ground level, not the track. On MMC, power and fibre are services carried on the elevated structure, not in troughs alongside the track at ground level. At ground level, what is left to secure is the pylon base at each span: a fixed point, not a continuous open strip of track and cable.

High-speed rail already has to be separated.

Safety and security, the deeper page →

Minimal footprint. The land stays in use.

MMC proposes the elevated corridor as the lowest-impact way to carry rail, power, water and services across a continent. At ground level there are pylon bases only: farms, waterways and wildlife keep moving underneath.

MMC-VC · caisson footprint
~0.05 ha/km

40 pylons per km × one 4.0 m caisson each = ~503 m² per km. Derived; assumptions below.

MMC-VB · caisson footprint
~0.1 ha/km

40 pylons per km × two 4.0 m caissons each = ~1,005 m² per km. Derived; assumptions below.

HS2 Phase One · land acquired
~31 ha/km

About 70 km² for 225 km of new line, including depots and replacement land. The 2009 estimate assumed a 120 m corridor, about 12 ha/km. Per-km figures derived.35,10

China · Shijiazhuang–Zhengzhou
69%

Share of the line on viaduct, chosen to limit land taken from fertile plains.34

Assumptions for the MMC figures. 25 m spans (40 pylons per km); caisson ring 4.0 m outside diameter (12.6 m² each); MMC-VC one leg per pylon, MMC-VB two. Counts the caisson at ground level only: it excludes construction access, any fencing at pylon bases, stations and depots. The HS2 figure includes depots and replacement land, so the two are not like-for-like; they show the order of difference, not an exact ratio.

The Environment page →

Environment, the deeper page →

Rail for everything.

The freight line is built first and then supplies the rest of the build. Components are delivered by rail, crews travel by rail, and construction proceeds without new road access along the route.

How it is built →

Rail-delivered construction, the deeper page →

Trade and tourism tie nations together.

An interlinked system ties nations together. Trade moves on the same corridors from nation to nation. Tourism moves people across borders, and meeting other peoples breaks down ignorance of their cultures and national identity. MMC proposes one standard, written together, as one worldwide umbrella that unites nations rather than dividing them.

That interlinked trade and tourism move nations away from conflict is the MMC position. The quotes above are what those leaders and bodies have said; they are not endorsements of MMC.

The Consortium →

Uniting nations, the deeper page →

Linked national electricity grids.

Every MMC corridor carries HVDC transmission. Joined across borders, national grids become one linked network: power moves from where it is made to where it is needed, across regions, weather systems and time zones. Linked grids give stability and flexibility.

EU cross-border trade
€34 bn

Estimated benefit of cross-border electricity trade in the EU in 2021, against no cross-border capacity.42

EU target
15%

Each EU country to be able to import at least 15% of its generating capacity from neighbours by 2030.43

Longest UHVDC
3,293 km

China's Changji–Guquan ±1,100 kV line carries 12 GW from Xinjiang to Anhui, in service since 2019.41,44

Less storage needed
31%

In a modelled 100% renewable European grid, interconnection cut the storage capacity needed by 31% on average.45

The 31% storage figure is a European model driven by wind and weather; it does not test smoothing across time zones or continents. Linking continents is the MMC proposal.

One global grid, the deeper page →

Cheap transport and services for all.

Poverty follows the people that transport, power and water do not reach. MMC proposes one corridor that brings low-cost travel, freight, electricity and water to every town along it, so people can reach markets, work, schools and health care. Linked grids bring solar power from the deserts along the corridors.

Without electricity
655 m

People without electricity in 2024.48 84% of people without electricity live in rural areas (2023).49

Without safe water
2.1 bn

People without safely managed drinking water in 2024: 1 in 4 people worldwide.50

Without a road
~1 bn

Rural people living more than 2 km from an all-season road (World Bank Rural Access Index, 2006 estimate).51

Solar power from the deserts, along the corridors.

The corridor carries the services; reaching homes away from the corridor needs local networks built from it. That MMC lowers the cost of transport and services for the people it reaches is the MMC proposal. The road figure is an old (2006) global estimate.

Out of poverty, the deeper page →

A calculated foundation, renewable for life.

Every MMC foundation is built from precast modules: caisson rings made in the factory and stacked as the cutter head drills down. No piles are driven. The weight of the caisson holds it at depth, so the pylon and topside follow the drilling without waiting on the ground. Each step is set before the crews arrive.

MMC-DWG-003-12 Foundation drilling, step by stepMMC-DWG-003-12 · Foundation drilling, step by step MMC-DWG-001-05 Tension tubularMMC-DWG-001-05 · Tension tubular

Calculated foundations, the deeper page →   The Foundation →

Over what is there, along what is there.

The elevated corridor can run over existing roads, rail lines, rivers and pipelines without cutting or closing them, and along existing transport and transmission corridors, on land already set aside. What runs underneath keeps running.

Bang Na Expressway · Thailand
55 km

Six-lane elevated road built above the median of the Bang Na–Trat highway for its full length, while the highway below was upgraded.5455

Caulfield–Dandenong · Melbourne
No land acquired

Elevated rail built along the existing line, beside the running tracks, with trains running and no land acquisition.5657

Over and along existing corridors, the deeper page →   Land take →

Water carried to where it is needed.

The corridor carries water on the structure: the aqueduct level on MMC-VA, and pipes in the structure on the other viaducts. Water moves from desalination plants, surplus catchments and recycled supply to dry regions, opening land for farms and towns.

World · drinking water
2.2 billion

People without safely managed drinking water in 2022.58

World · water scarcity
~Half

Of the world’s population faces severe water scarcity at least one month a year.58

WA · Goldfields pipeline
566 km

Mundaring Weir to Kalgoorlie, in operation since 1903.59

Water on the corridor →

Water security, the deeper page →

Data centres on desert power.

Data centres need large amounts of power, fibre and cooling. The corridor carries all three on one structure: HVDC from desert solar, fibre, and water. Data centres can be sited in the deserts along the corridor, away from crowded city grids.

Data centres · 2024
415 TWh

About 1.5% of the world’s electricity use.60

Data centres · 2030 projected
~945 TWh

More than double, slightly more than Japan’s total electricity use today.60

One AI-focused data centre
100,000 homes

Typical electricity use; the largest under construction use 20 times as much.60

HVDC →   Fibre →

Data centres in the desert, the deeper page →

Growth spread inland.

A town site on the corridor is serviced from the start: power, water, freight, passengers and fibre. Growth can go inland to new towns, not only into the capital cities. In the Australian plan, the corridors carry around 200 towns and eleven intersection cities.

Australia · capital cities, 2025
67.9%

Of the population lives in the capital cities: 18.8 million people.62

Australia · capital cities, 2036
69.4%

Projected share: the capitals keep growing faster than the regions.62

Australia · major cities
73%

Of the population lives in the major cities.63

Inner Nation Towns →   MMA: Cities →

New towns along the corridors, the deeper page →

One buck around the world.

The Vision: 1 dollar travel, anywhere in the world, on maglev. Freight and the fixed services on the same structure (power, water, fuels and fibre) are intended to carry the cost of passenger travel. An aim of the Consortium; the revenue model is detailed design.

Luxembourg · since 1 March 2020
Free

Buses, trains (except first class) and trams, nationwide: the first country to do so.64

Luxembourg · cost
~€500 m / year

Of which about €41 m is recouped from first-class tickets.65

Hong Kong MTR · 2024
HK$10.2 bn

Property development profit under the Rail plus Property model.66

Maglev →   The Consortium →

Low-cost fares, the deeper page →

Offset the jobs lost to AI. Solve the debt bomb.

Record debt and the AI transition arrive in the same decade. A global build of corridors, and the towns along them, puts people to work in every nation that joins and leaves assets that earn for a century.

Global debt · IIF
US$365T

A record, first half of 2026.67

Jobs exposed to AI · IMF
~40%

Of global employment; about 60% in advanced economies.69

New Deal works · 1935–43
8.5 million

People employed by the WPA.71

Local manufacturing →   The Consortium →

AI jobs and the debt bomb, the deeper page →

Cost savings and revenue streams.

Multi-service corridors are about 56% cheaper to build per km than single service lines, and every service on the corridor pays for use. Cost to build and income are the differentiators (estimate).

Build once
~56% cheaper

About A$146 m/km for ten or more services on MMC, against about A$335 m/km to build five separately.

Single corridor
Elevated

One corridor, one set of approvals and running costs, with less environmental impact.

Every service pays
~A$0.43 m

Per km a year from five services, against about A$0.25 m of shared running cost.

Travel near free
A$1 a trip

The long-term vision, between nations, as costs fall and services come on line.

Economics, in summary (estimate). Five services built separately: about A$335 m/km. Ten or more on one MMC corridor: about A$146 m/km. Each service is charged for use: about A$0.43 m per km a year from five services, against about A$0.25 m of shared running cost. The surplus moves passengers towards the long-term goal of A$1 a trip, between nations.

Build cost assumptions →   Charge rates →   Passengers and fares →   Funding →

Economics, the deeper page →

Sources.

  1. Institute for Government, HS2: costs and controversies. www.instituteforgovernment.org.uk
  2. UK Department for Transport, HS2 reset (oral statement), 19 May 2026. www.gov.uk
  3. Eno Center for Transportation, Timeline of California High-Speed Rail Cost Estimates, 2018. enotrans.org
  4. Railway Age, CHSRA Issues Draft 2026 Business Plan, 2026. www.railwayage.com
  5. European Court of Auditors, Special Report 19/2018: A European high-speed rail network: not a reality but an ineffective patchwork, 2018. op.europa.eu
  6. Flyvbjerg, Holm and Buhl, Underestimating Costs in Public Works Projects: Error or Lie?, Journal of the American Planning Association 68(3), 2002. arxiv.org
  7. Parliamentary Library, High-speed rail (FlagPost), January 2014. aph.gov.au
  8. Infrastructure Australia, High Speed Rail – Newcastle to Sydney, 2026. infrastructureaustralia.gov.au
  9. Minister for Infrastructure C. King, media conference, Newcastle, 2026. minister.infrastructure.gov.au
  10. UK Department for Transport, Full Business Case: HS2 Phase One, 2020. assets.publishing.service.gov.uk
  11. UK National Audit Office, High Speed Two reset, June 2026. www.nao.org.uk
  12. World Bank, Cost of high-speed rail in China one-third lower than in other countries, press release, 10 July 2014. www.worldbank.org
  13. World Bank, China's experience with high-speed rail offers lessons for other countries, press release, 8 July 2019. www.worldbank.org
  14. Transit Costs Project, Final Report, NYU Marron Institute, 2023. transitcosts.com
  15. Gottlieb and Haugbølle, The repetition effect in building and construction works: a literature review, SBi report 2010:03, 2010. vbn.aau.dk
  16. AEMO, 2026 Integrated System Plan, 25 June 2026. www.aemo.com.au
  17. IEA, Railways could provide much greater benefits for energy and the environment, press release, 2019. www.iea.org
  18. IEA, The Future of Rail, 2019. www.iea.org
  19. IEA, The Implications of Oil and Gas Field Decline Rates, 2025. www.iea.org
  20. Parliamentary Library, Australia's liquid fuel security: Budget update (FlagPost), 4 June 2026, citing Geoscience Australia. apo.org.au
  21. IEA commentary (Martin and Schulz), How global oil supplies have readjusted to help fill the huge gap left by the Strait of Hormuz shock, 2026. www.iea.org
  22. IEA, Transport (energy system page). www.iea.org
  23. Charting Transport, Trends in transport emissions (from DCCEEW National Greenhouse Gas Inventory data), 2025. chartingtransport.com
  24. TrackSAFE Foundation, Fatalities & injuries on the Australian heavy rail network 2001–2025, updated August 2026. tracksafefoundation.com.au
  25. ONRSR, Opinion: Crossing to the same side, 12 July 2024. onrsr.com.au
  26. Eurostat, Rail transport fatalities drop by 11% in 2024, 16 December 2025. ec.europa.eu
  27. TrackSAFE Foundation (ONRSR data), Level Crossing Fatalities, Injuries and Near Hits on the Australian Heavy Rail Network 2016–2023, March 2024. tracksafefoundation.com.au
  28. Rail Magazine, Services resume after sabotage attacks disrupt French rail network, 29 July 2024. railmagazine.com
  29. NPR via WSKG, An act of sabotage shut down parts of Germany's rail system for hours this weekend, 9 October 2022. www.wskg.org
  30. Notes from Poland, Poland confirms act of sabotage behind explosion that damaged rail line, 17 November 2025. notesfrompoland.com
  31. US Code of Federal Regulations, 49 CFR §213.347 (Cornell LII). www.law.cornell.edu
  32. China Railway Engineering Corporation, Beijing–Shanghai High-Speed Railway project page, 2023. www.crec.cn
  33. Guinness World Records, Longest bridge. www.guinnessworldrecords.com
  34. Ollivier, Sondhi and Zhou, High-Speed Railways in China: A Look at Construction Costs, World Bank, China Transport Topics No. 9, July 2014. openknowledge.worldbank.org
  35. UK National Audit Office, Investigation into land and property acquisition for Phase One of HS2, 2018. www.nao.org.uk
  36. Barrientos and Borda-de-Água, Railways as Barriers for Wildlife: Current Knowledge, in Railway Ecology, Springer, 2017. link.springer.com
  37. California High-Speed Rail Authority, Wildlife Movement fact sheet, c. December 2023. hsr.ca.gov
  38. Xia et al., Effect of the Qinghai–Tibet Railway on the migration of Tibetan antelope, Oryx 41(3), 2007. www.cambridge.org
  39. United Nations, Secretary-General's message for World Tourism Day, SG/SM/22362, 2024. press.un.org
  40. UN Tourism, Tourism and Peace. www.untourism.int
  41. Powerline, China's SGCC commissions world's first ±1,100 kV UHVDC project, 8 January 2019. powerline.net.in
  42. ACER, Final Assessment of the EU Wholesale Electricity Market Design, April 2022. moodle2.units.it
  43. European Commission, Electricity interconnection targets. energy.ec.europa.eu
  44. Hitachi Energy, Changji–Guquan UHVDC link (case study). www.hitachienergy.com
  45. Roth and Schill, Geographical balancing of wind power decreases storage needs in a 100% renewable European power sector, iScience 26(7):107074, 2023. pmc.ncbi.nlm.nih.gov
  46. Siemens, HVDC fact sheet, July 2012. massless.info
  47. Energy-Storage.news, Australian government approves renewables link to Singapore with up to 42GWh energy storage, 2024. www.energy-storage.news
  48. SEforALL, Tracking SDG7: The Energy Progress Report 2026 (IEA, IRENA, UNSD, World Bank, WHO). www.seforall.org
  49. World Bank, Tracking SDG 7 – The Energy Progress Report 2025, highlights, 20 June 2025. www.worldbank.org
  50. WHO/UNICEF JMP, Progress on household drinking water, sanitation and hygiene 2000–2024, August 2025. data.unicef.org
  51. World Bank, Measuring Rural Access: Update 2017/18, 2019 (citing the 2006 Rural Access Index). documents1.worldbank.org
  52. World Bank (ESMAP), Solar Photovoltaic Power Potential by Country, 23 July 2020. www.worldbank.org
  53. Solargis, Seasonality and socioeconomics: assessing global PV potential for the World Bank. solargis.com
  54. Brockmann, C. and Rogenhofer, H., Bang Na Expressway, Bangkok, Thailand: World’s Longest Bridge and Largest Precasting Operation, PCI Journal, January–February 2000. www.pci.org
  55. Bangkok Post, Call for revamp of new motorway blueprint. www.bangkokpost.com
  56. WSP, Caulfield to Dandenong Level Crossing Removal Project. wsp.com
  57. Victoria’s Big Build (Level Crossing Removal Project), Caulfield to Dandenong: straddle carrier fact sheet, 1 June 2017. bigbuild.vic.gov.au
  58. United Nations, Sustainable Development Goal 6: Water and sanitation (WHO/UNICEF 2022 data; UN World Water Development Report). www.un.org
  59. Water Corporation, CY O’Connor’s Golden Pipeline celebrates 120 years, January 2023. watercorporation.com.au
  60. IEA, Energy and AI: Executive summary, 2025. www.iea.org
  61. IEA, Energy and AI: Energy demand from AI, 2025. www.iea.org
  62. BITRE, Emerging Cities in Regional Australia, 2026. www.bitre.gov.au
  63. AIHW, Profile of Australia’s population, Australia’s welfare. www.aihw.gov.au
  64. Luxembourg Ministry of Mobility and Public Works, Free mobility. transports.public.lu
  65. Travel Tomorrow, Luxembourg celebrates 3 years of free public transport, 2023. traveltomorrow.com
  66. MTR Corporation, 2024 Annual Results announcement, March 2025. doc.irasia.com
  67. Institute of International Finance, Global Debt Monitor, September 2026, as reported by The Star: global debt a record above US$365 trillion. www.thestar.com.my
  68. Khaleej Times, IIF Global Debt Monitor: interest paid by advanced economies on traded government bonds, 2026. www.khaleejtimes.com
  69. IMF, Gen-AI: Artificial Intelligence and the Future of Work, Staff Discussion Note SDN/2024/001, January 2024. www.imf.org
  70. IMF, World Economic Outlook October 2014, Chapter 3: Is it time for an infrastructure push? The macroeconomic effects of public investment. www.imf.org
  71. Encyclopaedia Britannica, Works Progress Administration. www.britannica.com