Slip bowl and slips that hold the tension at the top.
| Design | Per unit | Per km | Mass each | Mass, all per unit |
|---|---|---|---|---|
| MMC-VC | 1 per pylon | 40 | — | — |
| MMC-VB | 2 per pylon | 80 | — | — |
| MMC-VA | 2 per pylon | 80 | — | — |
| MMC-VD | 2 per pylon | 80 | — | — |
| MMC-TB | 1 per tower | 5 | — | — |
| MMC-TB Guyed | 1 per tower | 5 | — | — |
| MMC-TA | 2 per portal | 10 | — | — |
From the MMC-DWG-005 bills of materials. Masses are estimates; "—" means not yet set.