Models · Modular Components

Modular components. One standard system. Seven designs.

Every MMC design is built from the same standard parts, made on the same production line. A bigger design uses more of them, not different ones. Pick a design to see it built, every part pointed out, with quantities per km.

Standard design: every model built from the same modular components.

This is the key to the MMC system. Standard components, made on one production line, build every model. This keeps the system simple, lowers cost and speeds up installation. A bigger design uses more of the same components, not different ones.

MMC-VC modular components sheet
MMC-DWG-005-01

MMC-VC

Single leg, single deck: the maglev passenger line. The smallest build of the standard system.

Per km: 40 pylons · 40 caissons · 80 pylon joints

MMC-VB modular components sheet
MMC-DWG-005-02

MMC-VB

Two legs at the outer edges, two decks: freight at 8 m, maglev at 19 m, with HVDC, pipelines and fibre. The Phase 0 standard.

Per km: 40 pylons · 80 caissons · 400 pylon joints

MMC-VA modular components sheet
MMC-DWG-005-03

MMC-VA

Two legs, five levels: freight, aqueduct, services, hyperloop reservation and maglev. The continental build.

Per km: 40 pylons · 80 caissons · 960 pylon joints

MMC-VD modular components sheet
MMC-DWG-005-07

MMC-VD

Two legs, three levels: freight at 8 m, a services deck at 19 m with the service rail and pipes on rollers, maglev at 26 m. Added 13 Nov 2026; quantities partly assumed.

Per km: 40 pylons · 80 caissons · 560 pylon joints

MMC-TB modular components sheet
MMC-DWG-005-04

MMC-TB

One leg, one captured cross-arm: the standard transmission tower, 22 kV to ±500 kV.

Per km: 5 towers · 5 caissons · 90 pylon joints

MMC-TB Guyed modular components sheet
MMC-DWG-005-05

MMC-TB Guyed

The standard tower plus three guys to ground anchors, for ±500 kV HVDC strain without a second leg.

Per km: 5 towers · 5 caissons · 90 pylon joints

MMC-TA modular components sheet
MMC-DWG-005-06

MMC-TA

Two standard towers with one cross-beam across the top, carrying one HVDC bipole; portals 200 m apart.

Per km: 5 portals · 10 caissons · 180 pylon joints

The products.

Select a part for its details, its summary drawing and the quantities per km in each design.

Cutter head — component drawing

Cutter head

Drills the bore, then stays in the ground as the anchor. One per caisson. Cast high-alloy steel with bit inserts.

Anchor latch — component drawing

Anchor latch

Latches the tension tubular into the cutter head. Releasable.

Caisson ring, castellated — component drawing

Caisson ring, castellated

Teeth top and bottom, so the stack can be turned.

Caisson ring, flush — component drawing

Caisson ring, flush

Flat faces, male to female. Simple installs, no rotation.

Caisson head — component drawing

Caisson head

Precast donut that closes the caisson; the tubular passes its 1 m hole.

Tension tubular — component drawing

Tension tubular

Proven oilfield technology: oilfield casing in ~12 m sections, top of the structure to the cutter head. Sizes from 7" to 30", L80: grades, materials and weights per foot are all available off the shelf.

Tension lock — component drawing

Tension lock

Slip bowl and slips that hold the tension at the top.

Pylon joint — component drawing

Pylon joint

Hollow precast unit, ~3 m, stacked to the height needed. One pylon joint is one stacked unit, as one tubular joint is one length of casing.

Pylon cap — component drawing

Pylon cap

Lid on a tower pylon joint; the tension lock sits on it.

Cross beam — component drawing

Cross beam

Spans the legs at each deck level; holes only where a tubular passes.

Longitudinal beam — component drawing

Longitudinal beam

Precast beams laid flush across the full width, 25 m pylon to pylon.

Aqueduct wall panel — component drawing

Aqueduct wall panel

Wall panels for the MMC-VA aqueduct channel. A needed product; size, number and mass are set in detailed design.

HVDC arm — component drawing

HVDC arm

Arm module carrying the HVDC insulator strings and conductors.

Guy wire and anchor — component drawing

Guy wire and anchor

TB Guyed only: three guys at ~70% height to ground anchors.

Service tools.

Tools run into the caisson and tubular to set, centre and anchor the products. Used as each job needs, so not counted per km. Built out as the design is developed.

Expansion packer — drawing

Expansion packer

Optional, soil dependent: set inside a segmented caisson; can lock onto the tubular. Two versions.

Centraliser and anchor centraliser — drawing

Centraliser and anchor centraliser

Bow springs keep the tubular centred; rigid fins line the latch up with the receptacle.

Insert packer (contingency anchor) — drawing

Insert packer (contingency anchor)

Small OD through the tubular hole, large expansion; seats the anchor if the receptacle is damaged.

Where each part fits.

Each part shown in place with the parts around it. The component pages show each part on its own.

Cross beam in place — drawing

Cross beam

HB3 and HB1 cross beams on the VB pylon. The tubular passes through the outer longitudinal beam and the cross beam at each deck, and down inside the hollow legs.

Pylon cap in place — drawing

Pylon cap

Sits on the top pylon joint; the tension lock sits in its pocket and the tubular runs through its centre hole.

Tension lock in place — drawing

Tension lock

Slip bowl and slips seated on the pylon cap or upper beam, gripping the tubular.

Pylon joint in place — drawing

Pylon joint

Stacked to form the leg; the tubular runs up its hollow core.

Anchor latch in place — drawing

Anchor latch

Made up to the bottom of the tubular; its dogs latch into the cutter head receptacle.

Centraliser in place — drawing

Centraliser

Clamped on the tubular; the bow springs keep it centred in the passage.

Expansion packer in place — drawing

Expansion packer

Run on the tubular and set: slips out to the bore wall.

Guy wire in place — drawing

Guy wire

From the leg at ~70% height to a ground anchor ~50 m out (MMC-TB Guyed).

HVDC arm in place — drawing

HVDC arm

Fixed to the leg; insulator strings and conductor bundles hang from it.

Aqueduct wall panel in place — drawing

Aqueduct wall panel

A wall panel each side of the channel, on the base. Size and number to detailed design.

Construction equipment.

The machines that drill, lift and move the products. Bespoke to the standard, and built out as the design is developed.

EquipmentWhat it doesDrawing
Dual drilling rigStraddles the rail on outriggers and drills both legs of a pylon at once. Top drive, drill pipe and caisson ram on each side.003-01 · 003-02 · 003-03
Mobile drilling rigTrack- or wheel-mounted rig, used where rail is not practical. Drills ahead of the topside team.003-04
Viaduct drilling derrickScenario B (rivers, wetlands, ravines, road and rail crossings): lowered by the bespoke rail crane from the built deck to drill the next foundation. Detailed design.003-05
Rail craneBespoke rail-mounted lifting on the deck, rated for ~100 t. Builds span by span: stacks the pylon, places the cross beam, launches the longitudinal beam, runs and tensions the tubular.003-06 · Build steps
Tracked craneGround crane that builds the first spans before the rail crane takes over on the deck.003-06
Transport frameHolds a caisson ring on edge on a flat wagon, 2 m wide in transit. Everything moves by rail.To come
Caisson guide templateTemporary template that seats the first caisson ring and holds it vertical, e.g. against river current.Foundation memo