Hollow precast unit, ~3 m, stacked to the height needed. One pylon joint is one stacked unit, as one tubular joint is one length of casing.
| Design | Per unit | Per km | Mass each | Mass, all per unit |
|---|---|---|---|---|
| MMC-VC | 2 per pylon | 80 | 11.4 t | 22.9 t per pylon |
| MMC-VB | 10 per pylon | 400 | 18.4 t | 184.2 t per pylon |
| MMC-VA | 24 per pylon | 960 | 15.6 t | 375.2 t per pylon |
| MMC-VD | 14 per pylon | 560 | 17.4 t | 243.8 t per pylon |
| MMC-TB | 18 per tower | 90 | 17.6 t | 317.4 t per tower |
| MMC-TB Guyed | 18 per tower | 90 | 17.6 t | 317.4 t per tower |
| MMC-TA | 36 per portal | 180 | 17.6 t | 634.9 t per portal |
From the MMC-DWG-005 bills of materials. Masses are estimates; "—" means not yet set.