One leg, one captured cross-arm: the standard transmission tower, 22 kV to ±500 kV. Every part is a standard MMC part, made on the same line as every other model. The sheet points to each one; the table counts them per tower and per km.
5 towers per km (200 m apart). Numbers match the callouts on the sheet.
| No. | Part | Per tower | Per km | Mass per tower |
|---|---|---|---|---|
| 1 | 1A | 5A | not set | |
| 2 | 1A | 5A | not set | |
| 3 | 5A | 25A | ~113.1 tA | |
| 4 | 1A | 5A | ~8.8 tA | |
| 5 | 6A | 30A | ~16.5 tA | |
| 6 | 18A | 90A | ~317.4 tA | |
| 7 | 1A | 5A | not set | |
| 8 | 1A | 5A | not set | |
| 9 | 1 | 5 | not set | |
| Concrete in parts with a set mass | ~2,200 tA | ~439 tA | ||
| Tubular steel | ~80 tA | ~16.5 tA | ||
| Mass not yet set: cutter head, anchor latch, pylon cap, tension lock, captured cross-arm |
Expansion packers and centralisers are fitted as each foundation needs and are not counted per km.
Each service adds its own parts on the same structure. Per km of corridor.
| Ref. | Service part | Per km | |
|---|---|---|---|
| A | Per circuit as designed for the voltage (22 kV to ±500 kV on TB; to ±1100 kV on TA). Not counted here. | ||
Service letters on the page list every service; the sheet letters only those drawn.
Unmarked figures are the model page's own, multiplied out. Values marked A rest on: