Two legs, five levels: freight, aqueduct, services, hyperloop reservation and maglev. The continental build. Every part is a standard MMC part, made on the same line as every other model. The sheet points to each one; the table counts them per pylon and per km.

Every part, pointed out.

Numbers 1–11 are the structural parts; letters are the services this build carries. Details 1 and 2 enlarge the foundation and the top of a leg. Select the sheet to open it full size.

MMC-DWG-005-03 MMC-VA modular components — the build with every part pointed out

The parts list.

40 pylons per km (25 m spans). Numbers match the callouts on the sheet.

No.PartPer pylonPer kmMass per pylon
1280not set
2280not set
320A800A~452.4 tA
4280~17.7 tA
512480~31.6 tA
624A960A~375.2 tA
75200~245 tA
8251,000~1,800 tA
9280not set
1012480not set
112A80Adetailed design
Concrete in parts with a set mass~115,610 tA~2,890 tA
Tubular steel~1,260 tA~31.6 tA
Total dead load per span (structure + services + water)~222,650 tA~5,566 tA
Mass not yet set: cutter head, anchor latch, tension lock, hvdc arm modules; aqueduct channel wall panels (detailed design); maglev guideways, hydrogen pipe
Precast modules, all types (published)~4,480~112

Expansion packers and centralisers are fitted as each foundation needs and are not counted per km.

Services this build carries.

Each service adds its own parts on the same structure. Per km of corridor.

Ref.Service partPer km
A
Freight tracks (3)
3 track-km; 6 km of rail; ~5,000 fastening setsA
B
Overhead line
3 km of contact wire; 20 portalsA
C
Aqueduct channel, full bay
40 channel wall pairsA; ~104,960 t of water when full (6.4 m deep × 16.4 m wideA)
D
HVDC conductors and insulators
3 conductors per side: 6 conductor-km per km on MMC-VB, 12 on MMC-VA; voltage, sub-conductors and capacity depend on the system (detailed design); 240 insulator strings (VB), 480 (VA)A
E
Gas pipe, 750 mm X80
1 km; ~84 lengths and weldsA; 40 supportsA
F
Hydrogen pipe
1 km, diameter not set; 40 supportsA
G
Fibre, 96-duct bank
96 duct-km; 1 km of duct bank
H
Hyperloop reservation
Space only: nothing installed; 2 tube-kmA when built
I
Maglev guideways (2)
2 track-kmA; 80 guideway segments of 25 mA

Service letters on the page list every service; the sheet letters only those drawn.

Assumptions.

Unmarked figures are the model page's own, multiplied out. Values marked A rest on:

  1. 25 m span, so 40 pylons per km; standard heights, flat ground.
  2. Maglev: two guideways, one segment per span. Freight: three tracks, fastenings at 0.6 m, overhead-line portals every second pylon.
  3. HVDC: one insulator string per pole at every pylon; six sub-conductors per pole bundle. Pipes: ~12 m lengths, one support per span.
  4. Pylon joints ~3 m (from MMC-VC: 2 segments for 6 m); counts are worked out from the heights on the 002 sheets.
  5. Tension tubular per leg = caisson depth + height to the top of the structure, in whole ~12 m sections (12 m confirmed by Brett, 9 Nov 2026).
  6. Caisson rings are 2.0 m tall (ruling 9 Nov 2026). Rings per caisson = planning depth ÷ 2, rounded up: VC 10 m → 5, VB 15 m → 8, VA 20 m → 10, VD 20 m → 10 (depth assumed as VA), towers 10 m → 5. Caisson depth depends on soil, rock and load and is confirmed by geotechnical study, so every ring count is provisional.
  7. Services per span (dead load only, no trains): freight rail 3 tracks × 2 rails × 25 m at 60 kg/m = ~9 t; HVDC 8 poles × 6 sub-conductors × 25 m at ~2.5 kg/m = ~3 t; gas pipe 750 mm, 15.9 mm wall = ~7 t; water pipe 1 m, 12 mm wall = ~8 t and its water ~20 t (VB); fibre ~1 t. VA water: full-bay channel 6.4 m deep × 16.4 m wide × 25 m = ~2,624 t (replaces the published 4,250 t). VA channel wall panels: size, number and mass to detailed design, not included in the dead load.
  8. Masses from geometry, reinforced concrete at 2.5 t/m³. Caisson ring 4.0 m OD, 0.4 m wall, 2.0 m tall: ~22.6 t. Caisson head 4.0 m OD, 1 m hole, 0.3 m thick: ~8.8 t. Teeth and grout not included.
  9. Pylon joints (ruling 10 Nov 2026): ~3 m each; every pylon 4.0 m outside diameter at the base (the caisson width) tapering to 2.5 m at its top, whatever its height. Wall taken as 300 mm at the base, thinning 100 mm per 99 m. Masses are estimated on that taper; detailed design is needed.
  10. Tubular: 20 in × 171 ppf = ~254 kg/m (VC: 13-3/8 in × 72 ppf = ~107 kg/m), per the model pages.
  11. Cross beams: memo masses. VC HB1 ~17 t; VB HB1 ~43 t, HB3 ~29 t; VA HB1–HB5 ~65, 65, 43, 43 and 29 t (Big Bertha memo); VD by analogy ~43 (freight), ~43 (services deck, as VA HB3) and ~29 t (maglev), assumed. Transmission cross-arms and cross-beams: not set.
  12. Longitudinal beams: estimate on Super-T proportions (1,000 mm deep for spans to 25 m; 100 mm webs; 240 mm base), widened to a flush 3.4 m unit: 180 mm top flange forming the deck, two 100 mm webs, a 1.2 m × 240 mm bottom flange, 1 m solid at each end: ~1.08 m² of concrete, ~72 t per 25 m beam. VA aqueduct level taken the same (its load is heavier; not yet sized).
  13. Cutter head: cast high-alloy steel with bit inserts; mass is not a design driver and is left to detailed design.

MMC-VA specification →   All parts →