Precast beams laid flush across the full width, 25 m pylon to pylon.
| Design | Per unit | Per km | Mass each | Mass, all per unit |
|---|---|---|---|---|
| MMC-VC | 3 per pylon | 120 | 72 t | 216 t per pylon |
| MMC-VB | 10 per pylon | 400 | 72 t | 720 t per pylon |
| MMC-VA | 25 per pylon | 1,000 | 72 t | 1,800 t per pylon |
| MMC-VD | 15 per pylon | 600 | 72 t | 1,080 t per pylon |
From the MMC-DWG-005 bills of materials. Masses are estimates; "—" means not yet set.