The same machines, the same method and the same trained crews on every corridor.
The standard comes with its own installation equipment and services, designed once for the MMC components and used on every corridor: the same equipment, the same method and the same trained crews, km after km, nation after nation.
Launching gantries for full-span viaducts may erect more than three or four spans per day.1
Over 80% of launching gantries in China, mainly for high-speed rail viaducts.1
217 m, 73,500 t tunnel elements from a purpose-built factory.2
China builds high-speed rail viaducts by the full-span method: precast box girders carried along the completed viaduct and lowered into place by a launching gantry. According to the maker of the SLJ900/32, more than 80% of these gantries have a capacity of 800–950 t, and they may erect more than three or four spans per day.1
The Fehmarnbelt tunnel is built from 89 precast elements: 79 standard elements, each 217 m long, and 10 special elements.3 A standard element weighs 73,500 t.2 In operation, the factory produces a standard element about every second week for some three and a half years; Femern describes industrial series production as making the build considerably more efficient.2