The Platform · Tools and machines

Service Tools & Equipment.

The Anchor Tension System service tooling — the equipment that installs, tensions, anchors, locks, and maintains the tubular tension column — is bespoke engineering. Sizes, load requirements, materials, and service environments are specific to ATS civil deployment and differ from oilfield service equipment. What the ATS inherits from oilfield service practice is the body of engineering knowledge developed over a century of upstream operations: how to design, install, tension, anchor, seal, and service tubular elements at depth. The ATS service tooling is bespoke equipment that uses oilfield service practice as its reference engineering tradition.

Run into the caisson and tubular.

Tools run into the caisson and tubular to set, centre and anchor the products. Used as each job needs, so not counted per km. Built out as the design is developed.

Packers

In oilfield practice, packers are primarily annular seals. In the ATS, packers are used primarily as mechanical actuators — radially expanding to drive segmented caisson rings outward against the wellbore wall (converting radial force to axial restraint), or expanding to set the packer at engineered depth within a solid caisson ring. When a packer is set against the inner surface of a concrete caisson, the slip element on the packer grips concrete — bespoke engineering distinct from the slip-on-steel applications of conventional oilfield service. The sealing function remains available as a secondary capability if required. Bespoke ATS equipment using the engineering category established in oilfield service practice.

Expansion packer — two versions, segmented-ring and solid-ring. It also acts as a centraliser for the tubular, and once the anchor is latched it locks onto the tubular, coupling the caisson to the tension column and adding tensile strength. Insert packer — small outside diameter, so it runs through the tension-tubular hole on a work string or wireline; large expansion, so it grips the caisson wall when set. It is the seat for the contingency anchor.

MMC-DWG-001-04 Expansion Packer — summary drawing
MMC-DWG-001-04 · Expansion Packer. Two versions: segmented-ring (radial lock) and solid-ring (slips on concrete). Also centralises the tubular and locks onto it once the anchor is latched. Summary sheet, Rev D. Select to enlarge.

Centralisers

Radial guides ensuring the tubular runs concentric within the caisson and pylon stack during installation. Prevents wall contact, abrasion, and misalignment during the lower of tubular assemblies through deep stacks. Engineered for ATS-specific tubular and caisson geometry; references oilfield centraliser engineering.

Centraliser — bow springs clamped on the tubular keep it centred while it is run in. Anchor centraliser — rigid fins just above the anchor latch line the latch up with the receptacle so it engages square.

MMC-DWG-001-10 Centralisers and Insert Packer — summary drawing
MMC-DWG-001-10 · Centralisers and Insert Packer. Centraliser, anchor centraliser, and the insert packer that seats the contingency anchor. Summary sheet, Rev B. Select to enlarge.

Each tool’s detail: Components →

What builds it.

The machines that build the platform. They are not products and are not counted per km.

EquipmentWhat it doesDrawing
Dual drilling rigStraddles the rail on outriggers and drills both legs of a pylon at once. Top drive, drill pipe and caisson ram on each side.MMC-DWG-003-01003-01MMC-DWG-003-02003-02MMC-DWG-003-03003-03
Mobile drilling rigTrack- or wheel-mounted rig, used where rail is not practical. Drills ahead of the topside team.MMC-DWG-003-04003-04
Viaduct drilling derrickScenario B (rivers, wetlands, ravines, road and rail crossings): lowered by the bespoke rail crane from the built deck to drill the next foundation. Detailed design.MMC-DWG-003-05003-05
Rail craneBespoke rail-mounted lifting on the deck, rated for ~100 t. Builds span by span: stacks the pylon, places the cross beam, launches the longitudinal beam, runs and tensions the tubular.MMC-DWG-003-06003-06
Tracked craneGround crane that builds the first spans before the rail crane takes over on the deck.MMC-DWG-003-06003-06
Transport frameHolds a caisson ring on edge on a flat wagon, 2 m wide in transit. Everything moves by rail.To come
Caisson guide templateTemporary template that seats the first caisson ring and holds it vertical, e.g. against river current.Foundation memo

Transport Frames

The aim is to move every MMC part by rail. Caisson rings (4.0 m outside diameter, 2.0 m tall) travel on edge in transport frames on flat wagons, so each ring is 2.0 m wide in transit. The frame holds the ring upright on the wagon. Frame design is not yet set.

Rail lifting equipment — bespoke rail-mounted lifting equipment rated for ~100 t. The heaviest single parts are a 25 m longitudinal beam (~72 t, estimate) and the cap beams (up to ~65 t). Detailed design to come.

Patent coverage: P3 Foundation Drilling System · P1, P2 · Patent family →

← TopsideManufacture →