Economics · Assumptions

Charge rate assumptions.

What each service on the corridor is charged for use, the volume assumed, and how the income per km is worked out.

How each figure is marked.

Status: Published Derived Assumed MMC estimate Rough
Published: a figure as stated by the source. Derived: calculated from published figures (the calculation is shown). Assumed: a value chosen for the estimate. MMC estimate: from MMC planning documents. Rough: a planning figure with no single published source. All figures on these pages are estimates.

Each service, per km of corridor, per year.

ItemValueBasisStatus
Freight — charge methodPer train-kmA set minimum charge per train per km to cover cost; pricing by weight and volume per km to followAssumed
Freight — rate~A$15 per train-kmEuropean full-cost benchmark €9.39 per train-km (18 countries) × A$1.62 per €1,4Derived
Freight — volume20 trains a dayTrunk corridor, each direction combinedAssumed
Freight — income~A$0.11 m per km a year20 × 365 × A$15Derived
Gas — rate~A$1.44 per GJAPA, Moomba–Wilton reference tariff5Published
Gas — rate per km~A$0.0011 per GJ-kmA$1.4357 ÷ ~1,300 km5Derived
Gas — volume100 PJ a yearTrunk pipeline throughputAssumed
Gas — income~A$0.11 m per km a year100,000,000 GJ × A$0.0011Derived
HVDC — rate~A$10 per MWh per 1,000 kmPlanning figureRough
HVDC — volume12.3 TWh a year2 GW line at 70% useAssumed
HVDC — income~A$0.12 m per km a year12.3 m MWh × A$0.01Derived
Fibre — rate~A$2,500 per duct-km a yearPlanning figureRough
Fibre — volume20 ducts leasedOf the ducts on the structureAssumed
Fibre — income~A$0.05 m per km a year20 × A$2,500Derived
Water — rate~A$500 per ML per 1,000 kmPlanning figureRough
Water — volume75 GL a yearMMC-VB water capacity6MMC estimate
Water — income~A$0.04 m per km a year75,000 ML × A$0.50Derived
Five services — total~A$0.43 m per km a yearSum of the fiveDerived
Shared running cost~A$0.25 m per km a yearRail fixed upkeep A$124,000 per track-km (2020 dollars) × 2 tracks7Derived
Left after running cost~A$0.18 m per km a year0.43 − 0.25Derived

International rates, and the MMC method.

ItemValueBasisStatus
Australia — ARTCWeight per km + flagfall per train-kmA$9.033 per 1,000 gross tonne-km + A$3.613 per km (SSFL, 2023); about A$30 per train-km for a 3,000-tonne train1Derived
Europe — average 2024Per train-km€2.96 per freight train-km (about A$4.80): direct cost of running the train plus mark-ups where the market can bear them2,3Published
Europe — full-cost benchmarkPer train-km€9.39 per train-km, weighted average of 18 countries (about A$15)4Published
Europe — Belgium 2023Per train-km€2.28 gross; €1.69 after subsidy8Published
United States — Class INot charged separatelyTrack and trains owned together; full freight rate 4.4 US cents per ton-mile (2020)9Published
MMCPer train-km, then weight and volumeMinimum charge per train-km to cover cost; then the larger of weight (tonnes) or volume (m³) per kmAssumed
Exchange rate: 1 EUR = A$1.62 (from 1 AUD = €0.616, 7 November 2026).

AI compute, once the network is running.

ItemValueBasisStatus
StageFinal stageOnce the corridors, power towns and PV farms are built and running; additional to the totals aboveAssumed
Town spacing100 kmTowns along the corridorAssumed
Data centre at each town100 MWPowered from the PV farms at the townsAssumed
Market rateUS$196.25 per kW a monthAverage power asking rate, year-end 202510Published
Revenue per data centre~A$343 m a year100,000 kW × US$196.25 × 12 ÷ 0.687Derived
Corridor share~10%Of data centre revenueAssumed
Corridor income per town~A$34 m a year10% × A$343 mDerived
Corridor income per km~A$0.34 m a yearA$34 m ÷ 100 kmDerived

Moving the compute.

ItemValueBasisStatus
Standard fibre, round trip~10 ms per 1,000 kmLight in glass at just under 200,000 km a second11Derived
Hollow-core fibre, round trip~7 ms per 1,000 kmAbout 33% lower latency than standard fibre12Derived
Starlink, median~37–45 msMeasured, US, 202513Published
Geostationary satellite, median>670 msMeasured, US, Q1 202614Published
Fibre along the corridor gives lower latency than satellite. Fibre figures are physical travel time over the route; satellite figures are measured user connections.

What the income figures take as given.

References.

  1. ARTC, Interstate access charges — Southern Sydney Freight Line indicative access charge (updated 30 June 2023). artc.com.au
  2. IRG-Rail, 14th Annual Market Monitoring Report — Working Document, March 2026 (€2.96 per freight train-km, 2024). autorite-transports.fr
  3. European Commission guidelines on track access charges, C/2025/2606 (Directive 2012/34/EU, Articles 31 and 32). eur-lex.europa.eu
  4. IRG-Rail, Benchmark on Financing of Main Railway Infrastructure Managers in Selected European Countries (9.39 € per train-km). irg-rail.eu
  5. APA Group, Gas transmission tariffs and terms. apa.com.au
  6. MMC Memo 4, MMA Phase 0 Maglev vs HSRA (75 GL a year, MMC-VB). multimodalcorridors.com
  7. IPART, Estimating the direct cost of rail access — Information paper, 31 January 2024. ipart.nsw.gov.au
  8. Regulator Belgium, Rail freight monitor 2024. regul.be
  9. US Department of Transportation, via Statista: average freight revenue per ton-mile, Class I rail. statista.com
  10. Pulse, Data centre power crunch pushes grid operators to rethink pricing, 7 April 2026. pulse.bot
  11. TechSpot, New hollow-core fiber outperforms glass. techspot.com
  12. Microsoft Azure Networking Blog, Microsoft Azure scales Hollow Core Fiber (HCF) production, 23 September 2025. microsoft.com
  13. Benton Institute, Starlink hits new highs in the US (Ookla data). benton.org
  14. Techlicious, Starlink real broadband: FCC speeds (Ookla data, Q1 2026). techlicious.com

Back to the Economics section →