A proposal for the world: interlinking passenger, freight, power and services corridors, built to one standard so they cost less to build in every nation that joins. 395 national corridors mapped so far across 130 nations, about 279,500 km measured city to city in straight lines (about 335,400 km built, at a route factor of 1.2).
Each nation plans its own corridors. Cross-border links join neighbours, sea crossings span the straits, and high-speed maglev spines join the continents — from Santiago to Singapore on one line.
Routes are indicative. Corridors are drawn city to city, through the cities on the existing railway wherever a line exists: MMC corridors follow those lines, upgrading the line or running above it on viaduct. Where no line exists, the corridor is new build. Final alignments are set at detailed design by terrain survey, geotechnical analysis, environmental and cultural heritage assessment, and agreement between the nations they connect.
MMC proposes a world network of interlinking corridors — passenger, freight, power, water and services — built to one standard in every nation. Standardisation is the premise: one design, manufactured in volume and built the same way everywhere, is proposed to lower the cost of building for every nation that joins.
Status: draft. This is a first draft of the network. Detailed planning is required. The spines are built first, then the spurs, and the network keeps growing until the world is interlinked by high-speed rail.
In 2006, 18 states signed the Intergovernmental Agreement on the Trans-Asian Railway Network under the UN Economic and Social Commission for Asia and the Pacific (UNESCAP). It came into force on 11 June 2009. It now covers about 125,500 km of rail across 28 countries, with a working group and a framework for railway border crossings. That agreement lists routes. MMC proposes the next step: one build standard, from manufacture to operation, across every corridor and every continent.
The Pacific Spine and the Asian Spine meet at the Bering Strait: one line from Santiago to Singapore, about 31,100 km straight-line (37,300 km built). Water crossings are by seabed shell, laid in a trench or tethered where the water is deep; the method for each crossing is set at detailed planning (see sea crossings).
Water crossings are by seabed shell: factory-cast concrete sections, floated out, sunk into a trench on the seabed, joined and covered, as at the Fehmarnbelt (18 km, about 40 m deep, under construction). Where the water is too deep for a trench, the proposal is a submerged tube tethered to the seabed; none has yet been built. The method for each crossing is set at detailed planning.
| Crossing | Route | Width (km) | Water depth | Depth class |
|---|---|---|---|---|
| Río de la Plata | Colonia – Buenos Aires | ~50 | inner estuary 1–5 m[1] | Shallow |
| Tatar (Nevelskoy) Strait | Lazarev – Pogibi | 7.3 | fairway 7.2 m[2] | Shallow |
| Palk Strait | Rameswaram – Talaimannar | ~50 | 1–3 m on the shoals; max 35 m[3] | Shallow |
| Sunda Strait | Merak – Bandar Lampung | 24 | average ~20 m[4] | Shallow |
| Strait of Malacca | Malacca – Dumai | ~48 | minimum average 25 m[5] | Shallow |
| Fehmarn Belt (under construction) | Puttgarden – Rødby | 18 | immersed tunnel at ~40 m[6] | Built type |
| Øresund (in use) | Copenhagen – Malmö | 3.4 immersed | immersed tunnel[6] | Built type |
| Channel Tunnel (in use) | Calais – Folkestone | 37.9 undersea | tunnel max ~75 m[7] | Built type |
| Bering Strait | Wales – Uelen | 82 | average 30–50 m; max 90 m[8] | Shallow to moderate |
| Taiwan Strait | Pingtan – Hsinchu | 126 | average 60 m; max 150 m[9] | Moderate |
| La Pérouse Strait | Korsakov – Wakkanai | 43 | 51–118 m[10] | Moderate |
| Korea Strait | Fukuoka – Busan | ~200 | east channel ~110 m; west channel up to 227 m[11] | Moderate |
| Strait of Messina | Villa San Giovanni – Messina | 3.1 | sill 81–120 m[12] | Moderate |
| Gulf of Finland | Helsinki – Tallinn | ~80 | over 100 m at the deepest points[13] | Moderate |
| North Channel | Stranraer – Belfast | ~40 | Beaufort’s Dyke to 312 m; corridor north of it up to 200 m[14] | Moderate to deep |
| Cook Strait | Wellington – Picton | 22 | average 128 m; Narrows Basin 300–400 m[15] | Moderate to deep |
| Strait of Tiran | Sharm el-Sheikh – Ras Hamid | 13 | Enterprise passage 290 m; Grafton passage 73 m; Saudi side 16 m[16] | Moderate to deep |
| Bab-el-Mandeb | Dhubab – Djibouti | 26 | up to ~300 m[17] | Moderate to deep |
| Strait of Gibraltar | Tarifa – Tangier | ~28 (Camarinal Sill route) | sill ~280–300 m; tunnel to ~475 m below sea level[18] | Deep |
| Scotland – Faroe Islands (future) | Thurso – Tórshavn | ~420 | Faroe–Shetland Channel to 1,900 m; Faroe Bank Channel sill 840 m[19] | Deep |
| Faroe Islands – Iceland (future) | Tórshavn – Seyðisfjörður | ~510 | Iceland–Faroe Ridge largely under 500 m[19] | Deep |
| Mozambique Channel (future) | Angoche – Mahajanga | 419 at narrowest | to 3,292 m[20] | Deep |
| Åland Sea and Archipelago Sea | Kapellskär – Mariehamn – Turku | ~250 | Åland Sea to 301 m; Archipelago Sea mean 19 m[21] | Deep |
| Strait of Sicily (future) | Marsala – Kélibia | ~145 | max 316 m[22] | Deep |
| Riau Islands and Java Sea (future) | Singapore – Batam – Bangka – Jakarta | ~880 | Java Sea mean 46 m[24] | Shallow to moderate |
| Luzon Strait (future) | Kaohsiung – Basco – Aparri | ~250 | mean ~2,200 m; to ~4,000 m[23] | Deep |
Depth classes: shallow — within the depth of seabed shells built to date (Fehmarnbelt, about 40 m); moderate — deeper than seabed shells built to date, within the depth of bored undersea tunnels built to date (Ryfylke, Norway, 291 m below sea level); deep — beyond both; a tethered submerged tube or a deeper bored tunnel would be required. Widths are at the narrowest point or along the route named. The links from Australia to Asia, New Guinea, the Pacific and New Zealand are undersea links, set out below.
The MMA plan joins Australia to Asia, New Guinea, the Pacific and New Zealand by seven undersea links: multimodal corridors laid on the seabed to the MMC standard, without rail. The services each link carries are set for that link under the standardisation policy. The seven links run about 25,100 km, measured along the alignments drawn in the MMA plan.
| Link | Length along the drawn alignment (km) |
|---|---|
| Darwin – Singapore | ~3,500 |
| Darwin – Manila | ~3,300 |
| Port Hedland – Java | ~2,400 |
| Darwin – Port Moresby | ~1,900 |
| Mackay – Honiara | ~1,800 |
| Mackay – Suva – Honiara (Pacific loop) | ~9,900 |
| Brisbane – Auckland | ~2,300 |
| Total | ~25,100 |
Every city on the mainland networks, and on the islands joined by sea crossings, can be reached from every other by rail. The Americas join Asia at the Bering Strait. Asia joins Europe through Russia, Kazakhstan, the Caucasus and the Eurasian Spine. Europe joins Africa by a sea crossing at the Strait of Gibraltar and by a future crossing of the Strait of Sicily, and Iceland through the Faroe Islands by a future crossing. Manila joins Taiwan by a future crossing of the Luzon Strait, and Singapore joins Jakarta directly by a future crossing through the Riau Islands, Bangka and the Java Sea. Asia joins Africa through Sinai and by sea crossings at the Strait of Tiran and the Bab-el-Mandeb. Madagascar joins Africa by a future Mozambique Channel crossing. Australia joins New Guinea across the shallow Torres Strait, and Asia through the islands of Indonesia: both are drawn as future rail crossings, the target as technology allows, as are Iceland and Madagascar. Until they are built, Australia, New Zealand and Papua New Guinea join the network by the undersea links of the MMA plan.
| Region | Nations | Corridors | Straight-line km | Built km (×1.2) |
|---|---|---|---|---|
| North America | 3 | 37 | 53,300 | 64,000 |
| Central America | 7 | 11 | 2,500 | 3,000 |
| South America | 11 | 33 | 33,700 | 40,400 |
| East and South-East Asia | 14 | 60 | 60,000 | 72,000 |
| South and Central Asia | 8 | 29 | 21,700 | 26,000 |
| Middle East and the Caucasus | 17 | 38 | 18,600 | 22,300 |
| Europe | 31 | 92 | 27,100 | 32,600 |
| Africa | 36 | 76 | 42,000 | 50,500 |
| Oceania | 2 | 4 | 1,500 | 1,800 |
| Australia (MMA plan) | 1 | 15 | 19,100 | 22,900 |
| Mapped so far | 130 | 395 | 279,500 | 335,400 |
Cross-border links are counted separately. Built km = straight-line km × 1.2 (stated assumption). Australia’s routes are measured along the drawn alignments of the MMA plan and counted as built km; its straight-line figure is that length ÷ 1.2.
North America: United States · Canada · Mexico
South America: Argentina · Brazil · Chile · Colombia · Peru · Venezuela
East and South-East Asia: China · Japan · Korean Peninsula · Malaysia, Singapore, Indonesia · Russia · Thailand · Vietnam
South and Central Asia: Bangladesh, Myanmar · Central Asia and the Caucasus · India, Sri Lanka · Kazakhstan · Pakistan
Middle East: Arabia · Iran, Afghanistan · The Levant · Türkiye
Europe: The Balkans · France · Germany · Italy · Nordic, Baltic, Iceland · Spain, Portugal · United Kingdom, Ireland
Africa: Central Africa · East Africa · North Africa · Southern Africa · West Africa
Oceania: Australia · New Zealand
The MMC platform is available to any nation building to the standard. If your government, agency, or capital partner could initiate a project in any nation: Make contact.