Every option for crossing the sea, what each can carry, and the MMC tunnel crossings.
The land catalogue sets out the viaduct and tower models. At sea the choice is between a structure (bridge or tunnel) and a subsea line lane.
Status: draft. Demonstrative, not detailed design. Sizes and layouts are indicative.
Every option is open. The choice for each lane depends on water depth, distance, seabed, shipping and which MM Lines the lane must carry.
| Option | What it is | MM Lines it can carry | Status |
|---|---|---|---|
| Bridge or viaduct | The corridor structure carried over the water | All | In use worldwide; limited by span and depth |
| Immersed tunnel (seabed shell) | Factory-cast sections floated out, sunk into a seabed trench and joined | All, passengers included | In use (Øresund); Fehmarnbelt under construction, ~40 m[6] |
| Bored tunnel | Tunnel bored through the rock under the seabed | All, passengers included | In use (Channel Tunnel[7]; Ryfylke, 291 m below sea level) |
| Tethered submerged tube | A tube floating below the surface, tethered to the seabed | All, passengers included | Proposed; none built |
| Subsea line lane (bundle) | MM Lines laid on the seabed in armoured bundles, with landfall links and tie-in points | Power, fibre, gas, liquid fuels, hydrogen, water | MMC proposal, built on oilfield bundle and subsea cable practice[A][B] |
| Single subsea cable or pipeline | One line laid on its own | One line each | In use; HVDC cable laid to 2,150 m[C] |
Assumption: maglev, hyperloop, freight, service rail and road need a tunnel or bridge; a bundle carries the pipe and cable lines only.
Water crossings are by seabed shell: factory-cast concrete sections, floated out, sunk into a trench on the seabed, joined and covered, as at the Fehmarnbelt (18 km, about 40 m deep, under construction). Where the water is too deep for a trench, the proposal is a submerged tube tethered to the seabed; none has yet been built. The method for each crossing is set at detailed planning.
| Crossing | Route | Width (km) | Water depth | Depth class |
|---|---|---|---|---|
| Río de la Plata | Colonia – Buenos Aires | ~50 | inner estuary 1–5 m[1] | Shallow |
| Tatar (Nevelskoy) Strait | Lazarev – Pogibi | 7.3 | fairway 7.2 m[2] | Shallow |
| Palk Strait | Rameswaram – Talaimannar | ~50 | 1–3 m on the shoals; max 35 m[3] | Shallow |
| Sunda Strait | Merak – Bandar Lampung | 24 | average ~20 m[4] | Shallow |
| Strait of Malacca | Malacca – Dumai | ~48 | minimum average 25 m[5] | Shallow |
| Fehmarn Belt (under construction) | Puttgarden – Rødby | 18 | immersed tunnel at ~40 m[6] | Built type |
| Øresund (in use) | Copenhagen – Malmö | 3.4 immersed | immersed tunnel[6] | Built type |
| Channel Tunnel (in use) | Calais – Folkestone | 37.9 undersea | tunnel max ~75 m[7] | Built type |
| Strait of Magellan, Primera Angostura | Punta Delgada – Bahía Azul | 3.7 (tunnel proposed in Chile’s regional plan) | not published in the sources found[25] | To be set |
| Bering Strait | Wales – Uelen | 82 | average 30–50 m; max 90 m[8] | Shallow to moderate |
| Taiwan Strait | Pingtan – Hsinchu | 126 | average 60 m; max 150 m[9] | Moderate |
| La Pérouse Strait | Korsakov – Wakkanai | 43 | 51–118 m[10] | Moderate |
| Korea Strait | Fukuoka – Busan | ~200 | east channel ~110 m; west channel up to 227 m[11] | Moderate |
| Strait of Messina | Villa San Giovanni – Messina | 3.1 | sill 81–120 m[12] | Moderate |
| Gulf of Finland | Helsinki – Tallinn | ~80 | over 100 m at the deepest points[13] | Moderate |
| North Channel | Stranraer – Belfast | ~40 | Beaufort’s Dyke to 312 m; corridor north of it up to 200 m[14] | Moderate to deep |
| Cook Strait | Wellington – Picton | 22 | average 128 m; Narrows Basin 300–400 m[15] | Moderate to deep |
| Strait of Tiran | Sharm el-Sheikh – Ras Hamid | 13 | Enterprise passage 290 m; Grafton passage 73 m; Saudi side 16 m[16] | Moderate to deep |
| Bab-el-Mandeb | Dhubab – Djibouti | 26 | up to ~300 m[17] | Moderate to deep |
| Strait of Gibraltar | Tarifa – Tangier | ~28 (Camarinal Sill route) | sill ~280–300 m; tunnel to ~475 m below sea level[18] | Deep |
| Scotland – Faroe Islands (future) | Thurso – Tórshavn | ~420 | Faroe–Shetland Channel to 1,900 m; Faroe Bank Channel sill 840 m[19] | Deep |
| Faroe Islands – Iceland (future) | Tórshavn – Seyðisfjörður | ~510 | Iceland–Faroe Ridge largely under 500 m[19] | Deep |
| Mozambique Channel (future) | Angoche – Mahajanga | 419 at narrowest | to 3,292 m[20] | Deep |
| Åland Sea and Archipelago Sea | Kapellskär – Mariehamn – Turku | ~250 | Åland Sea to 301 m; Archipelago Sea mean 19 m[21] | Deep |
| Strait of Sicily (future) | Marsala – Kélibia | ~145 | max 316 m[22] | Deep |
| Riau Islands and Java Sea (future) | Singapore – Batam – Bangka – Jakarta | ~880 | Java Sea mean 46 m[24] | Shallow to moderate |
| Luzon Strait (future) | Kaohsiung – Basco – Aparri | ~250 | mean ~2,200 m; to ~4,000 m[23] | Deep |
Depth classes: shallow — within the depth of seabed shells built to date (Fehmarnbelt, about 40 m); moderate — deeper than seabed shells built to date, within the depth of bored undersea tunnels built to date (Ryfylke, Norway, 291 m below sea level); deep — beyond both; a tethered submerged tube or a deeper bored tunnel would be required. Widths are at the narrowest point or along the route named. The links from Australia to Asia, New Guinea, the Pacific and New Zealand are undersea links, set out below.
[C] Offshore Energy, Nexans installs HVDC cable at 2,150 m
Where lanes meet at sea, a standard platform does the job of the seabed manifold above water: fixed jacket, artificial island or MMC pylon platform. See Subsea Equipment and drawing 007-06.
Subsea engineering: Build · MM Lines · Models · Components · Equipment · Drawings · Undersea Lanes (hubs and maps)