One manifold near shore at each landfall. New lanes are connected to it subsea as they arrive, and the lines to land are sized for them from the start. Where lanes meet at sea, a standard platform does the same job above water. Service vessels and equipment are built to one standard and made locally.
The undersea lanes lay several lines in one armoured bundle: power, water and fibre. This page sets out the equipment that joins those bundles to the land and to each other, and the vessels that lay and repair them.
Status: draft. Demonstrative, not detailed design. Layouts, slot counts, distances and depths are indicative.
Each landfall has one manifold on the seabed a short way offshore. The armoured bundle ends at a towhead beside it, where the lines are split. The manifold has two complete tie-ins, eight slots in all. Tie-in A serves the lane in service, with a slot for each line: water, fibre, power and HVDC. Tie-in B has a matching spare for each line; its slots are empty and capped, ready for the next lane. A protection structure covers the manifold.
From the manifold the lines go to land through bores drilled under the beach and the surf zone (horizontal directional drilling), and on to a shore station: the HVDC converter, the pump station, the cable landing station and the substation.
The next lane is laid to the manifold, not to the beach. It ends at its own towhead and its lines are connected subsea into tie-in B by a remotely operated vehicle (ROV) working from a support vessel. Tie-in A keeps running while tie-in B is connected.
The lines to land, through the bores, and the shore station (converter, pump station, cable landing and substation) are sized for both tie-ins from the start. The next lane needs no new bore and no new station: the landfall is built once.
Each line type is connected the way the subsea industry already connects it, except HVDC.
| Line (slots) | Connection at the manifold | Status today |
|---|---|---|
| Water, fuel (1, 5) | Valve and short connecting pipe (jumper), operated by ROV | In use in offshore oil and gas |
| Fibre (2, 6) | Branching unit or splice; a branching unit adds a new branch without disrupting the main routeD | In use in subsea telecomD |
| Power to 36 kV AC (3, 7) | Wet-mate connector, joined on the seabed | International standard IEC/IEEE 61886-1 covers 3–36 kVA; one connector certified to 36 kV, 500 A, 3,000 mB |
| HVDC (4, 8) | Subsea HVDC connector | Technology to develop |
| Tie-in B (slots 5–8) | The same four connections, empty and capped | For the next lane |
No subsea connector at HVDC transmission voltage was found. The highest-voltage subsea power connection found is a 145 kV dry-mate system, which its maker describes as the only one in the market qualified above 100 kVC. A dry-mate connector is joined on deck and then lowered; it cannot be joined on the seabed. HVDC links run at hundreds of kilovolts.
Today an HVDC cable is joined on a vessel: the cable is lifted, jointed on deck and laid back. A subsea HVDC connector, joined on the seabed by ROV, is a technology for the MMC programme to develop. Until it exists, the two HVDC slots on the manifold (4 and 8) are jointing positions served by a vessel.
One global standard for the lanes means one standard for the vessels and equipment that lay and repair them: the same bundle, the same towheads, the same manifold slots, the same connectors everywhere. Built to that standard, the vessels and equipment can be made locally, in each region the lanes serve, which supports local manufacturing and jobs.
| Vessel or equipment | Role | On the site |
|---|---|---|
| Lay vessels (three per lane, one lay hull) | One line per vessel; the centre vessel joins and armours the lines and lays the bundle | 007-02, 007-03 |
| ROV support vessel (standard service hull) | Same hull as the repair vessel with a ROV fit-out: connects new lanes at the manifold, inspection | 007-05 |
| Repair vessel (standard service hull) | Large: retrieves the armoured bundle over the bow and repairs it on deck, in a jointing hall amidships; carries spare bundle and two work-class ROVs; HVDC jointing until the subsea connector exists | 007-05 |
| Spare reels and bundle lengths | Carried on the repair vessels (spare-bundle carousel) | — |
| Manifold modules, towheads, connectors | Built to one standard; slots added as lanes arrive | 007-04 |
| Protection structures | Cover manifolds and towheads | 007-04 |
Published vessel figures: the largest cable-lay ships carry 10,000 t and 7,000 t carouselsE; reel-lay vessels lay steel pipe up to 20 in from a 5,600 t reelF.
The fleet is built to two hulls. The lay hull, about 170 m, serves the three lay vessels; the largest cable-lay ships published are 171 m long, 34–38 m wide, with carousels to 18,000 tG. The standard service hull, about 150 m, takes either a repair fit-out or a ROV support fit-out.
A repair vessel recovers the armoured bundle over the bow and repairs it on deck, so it is large. It carries a cable engine, a jointing hall amidships, where roll and pitch are leastH, a spare-bundle carousel, a crane and two work-class ROVs. A published reference is Nexans Aurora: 149 m by 31 m, 10,000 t, fitted for bundle laying, protection and jointingI. Published ROV support vessels are smaller (about 96–97 m) and built to their own designs; one hull for both fit-outs is an MMC proposal.
Where lanes meet at sea, away from a landfall, a platform takes the place of the seabed manifold. The lines rise to the deck and are joined there, above water and in the dry, so no subsea connector is needed at that point — including for HVDC. The platform also houses what the seabed cannot: transformers and converters, switchgear, pumps for the water line, and a base for ROVs and crews, with a helideck and a boat landing. It can run mostly uncrewed; Belgium’s Princess Elisabeth Island is designed that way, with a helipad and fast crew transferN.
Platforms are standardised like the rest of the lanes: one platform design, built in series, with the same topside modules everywhere — tie-in deck, transformer and converter modules, switchgear, pump module, ROV and crew module — and a jacket family by water depth. Design once, build many. There is a precedent: TenneT is connecting 14 HVDC links of 2 GW each in the North Sea by 2032 on a standardised, one-fits-all 2 GW offshore platformJ, and has contracted transport and installation of at least fourteen of them under multi-year framework agreementsK.
| Type | What it is | Reference | To watch |
|---|---|---|---|
| A · Fixed platform | Steel jacket piled into the seabed, with a topside of equipment modules | TenneT 2 GW standard platform: topside 25,500–32,000 t, jacket 9,500–13,000 t, in 40–45 m of waterK, L | Weight and cost; deeper water costs more |
| B · Artificial island | Concrete caissons filled to form an island; all high-voltage equipment on one site | Princess Elisabeth Island, 45 km off Belgium; chosen instead of several platforms to bundle all high-voltage infrastructureM; all 23 foundation elements installedN | Cost overruns; HVDC contracts postponed on HVDC prices; scope moved toward ACM |
| C · MMC pylon platform | MMC pylons and deck modules standing in shallow water, for straits on a lane | MMC proposal | Not yet designed for wave and ship loads |
The near-shore manifold stays at each landfall; platforms are for junctions at sea.