Water is one key to the MMC design. Flood overflow is captured at scale, pumped on power from the desert solar farms, stored, and moved on the elevated corridor where it is needed, without damming or draining the rivers. It is a national transfer system for the whole nation.
The towns, the PV farming, the data centres and the industry along the corridor all need water. Harvesting it and moving it on the corridor is what opens the land.
Water is taken only in high-flow and flood events. Nothing is built across the river channel.
Drawing: drilling from the viaduct → Drawing: build scenarios along a route → Environment: the lowest-impact system →
About 550 m elevation in central Australia, with gravity delivery south and no large northern dams.1
Domestic supply for every town on the corridor.
Irrigation for the farmland under and around the solar.
Cooling water for the AI data centres in the towns.
Process water for green hydrogen and industry.