Every town hub is surrounded by solar and farmland: agrivoltaics under the panels, PV at scale, CSP and wind, and irrigated farmland expanding past the PV, fed from the corridor aqueduct.
Each town is the hub for the solar and farmland around it, built in concentric rings and extended outward as demand grows.
About 200 km² of solar at MMA’s density, in rings out to about 8.2 km.
Each new ring adds about 5 GW and about 200 km²: 10 GW at 11.5 km, 20 GW at 16.1 km.
200 towns at about 5 GW each.