SBC Phase 1 — Australia

Continental rollout — first phase.

The first continental phase of the SBC programme. Two intercontinental corridors — SBC #1 Brisbane to Perth and SBC #2 Darwin to Adelaide — built to the full MMC-VA five-level viaduct standard. Together with the Alice Hub PHES (40 GW pumped hydro at 770m head, 32-day sovereign energy reserve), Phase 1 establishes the continental energy and water sovereignty backbone that the rest of the network depends on.

Phase 1 corridors.

Phase 1 deploys the full MMC-VA five-level viaduct (freight at 8m, aqueduct at 17m, services at 26m, hyperloop reservation at 37m, maglev at 50m) on two intercontinental corridors. These corridors connect the eastern seaboard to the west and the north to the south, opening up the continental interior to integrated freight, energy, water, and passenger service.

SBC #1Brisbane to Perth — ~4,000km — east–west continental corridor connecting the eastern and western seaboards across the Nullarbor
SBC #2Darwin to Adelaide — ~2,400km — north–south continental corridor through Alice Springs and the Alice Hub PHES
ConfigurationMMC-VA — dual-leg, five-level viaduct (the full continental standard)
Service levelsLevel 1 freight (8m), Level 2 transcontinental aqueduct (17m), Level 3 services — gas, hydrogen, fibre, distribution (26m), Level 4 hyperloop reservation (37m), Level 5 maglev passenger (50m)
Anchor projectAlice Hub PHES — 40 GW pumped hydro, ~30 TWh storage, transcontinental aqueduct hub
StatusProposed — corridor sequencing and detailed engineering memos pending Phase 0 commitment

Route alignment is indicative. The corridor shown on the project map is a suggested alignment based on the current planning case. Final geometry is subject to detailed engineering — terrain survey, geotechnical analysis, environmental and cultural heritage assessment, and stakeholder consultation will determine the final alignment at detailed design.

Alice Hub PHES — the centre of the continent.

Phase 1 also delivers the Alice Hub Pumped Hydro Energy Storage system — a continental-scale energy reserve in the MacDonnell gorges south of Alice Springs. 40 GW pumped hydro at 770m head, ~30 TWh storage, 32-day sovereign energy reserve. Phased build over 15 years from Phase 1 start. The Alice Hub anchors the SBC #2 Darwin–Adelaide corridor at its centre and provides the continental energy and water reserve that the rest of the network depends on.

The transcontinental aqueduct — a 17m × 10m sealed pressurised water main carried on Level 2 of the MMC-VA viaduct — runs through Phase 1 corridors, pumped uphill to Alice Hub and gravity-fed south and east. Continental water sovereignty is delivered by Phase 1.

In Prep Alice Hub PHES. Continental-scale pumped hydro storage in the MacDonnell gorges. 40 GW / 16,000 GL / ~30 TWh at 770m head. Staged build across four phases over 15 years. Includes Aboriginal cultural heritage co-design framework as a precondition. Cost analysis pending review. In active engineering

Phase 1 documentation in active preparation.

Phase 1 documentation — including the Alice Hub PHES memo, the SBC #1 and SBC #2 corridor specifications, the transcontinental aqueduct hydraulic design, and the Phase 1 financial and economic case — is in active engineering development and will be added here as released.

Contact the SBC team to discuss Phase 1 →