SBC Phase 0-2 — Australia

Newcastle to Sydney Central.

133.2km single-leg single-deck MMC-VC viaduct, taking the ridge route through the Watagan ranges. ~13-minute Newcastle–Sydney maglev journey at 600km/h, with no tunnels and no speed reduction. Self-building ridge construction methodology — the completed viaduct supplies its own access road to the construction front. By-product of the Phase 0 Megafactory — establishment cost zero.

Phase 0-2 at a glance.

CorridorNewcastle CBD → Cessnock → Watagan ridges → Hornsby → Parramatta → Sydney Central / WSA
Length133.2km
Maximum slope2.5°
TunnelsZero
ConfigurationMMC-VC — single-leg, single-deck viaduct
ServiceMaglev passenger only — 600km/h
Journey time~13 minutes Newcastle CBD to Sydney Central
Pylon heightVariable — 6m on flat terrain, 10–60m above ridge surface, up to 150m+ at valley crossings. Same production segment family stacks to required height.
Tubular13.375" L80 13Cr API 5CT (single per pylon — reduced from Phase 0's 20")
Cost — civilPending review
Total programmePending review
Production engineNewcastle Megafactory — already running for Phase 0
Establishment costZero — absorbed by Phase 0

Route alignment is indicative. The corridor shown on the project map is a suggested alignment based on the current planning case. Final geometry is subject to detailed engineering — terrain survey, geotechnical analysis, environmental and cultural heritage assessment, and stakeholder consultation will determine the final alignment at detailed design.

Project documentation in preparation.

A dedicated Phase 0-2 project memo (covering the ridge route, the self-building construction methodology, the Megafactory marginal cost argument, and the head-to-head comparison with HSRA Line 1) is in active engineering development and will be added here on release.

Memo 4 (SBC Phase 0 Maglev vs HSRA) on the Phase 0 page covers the comparison with HSRA's Sydney–Newcastle proposal at programme level. System-level memos applicable to Phase 0-2 are catalogued in the Library — the MMC-VC single-leg configuration uses the same Megafactory, foundation system, and segment family as MMC-VB.

Phase 0-2 documentation in active preparation.

Project-specific Phase 0-2 documentation — including the dedicated Phase 0-2 engineering memo, the ridge route specification, the self-building construction methodology details, and the rolling stock procurement strategy — is in active engineering development and will be added here as released.