The MMC Memo Series

Memos.

Memos on the Multi-Modal Corridors platform — the engineering, the economics, the global standard, and the plan to build it across nations. Each memo is a standalone reference document, citable and freely available. Newest first.

16 memos · latest first

Memo 17Global Network

What China’s High-Speed Network Shows

The record of China’s 50,000 km high-speed network: 4.26 billion rail trips in 2025, short-haul flights down, cross-border tourism on the China–Laos line. And the limits: about 74% of freight tonnage still moves by road, a 6.19 trillion yuan debt, benefits concentrated near the central nodes — with the MMC proposal against each.

Read →
Memo 16Transmission

MMC-T Transmission Tower Tension Sizing

How a single production unit (4m base, 1m top, single 20" L80 13Cr tubular) covers approximately 99.5% of every continental transmission deployment, with worked PT requirements across the full voltage range and a 60-year lifecycle NPV comparison against steel lattice equivalents.

Read →
Memo 15Platform

Caisson Megafactory Production

The manufacturing architecture for ~2.1 million precast caisson rings required across the 96,000 Phase 0 foundations. Applies the canonical MMC Megafactory framework to caisson production specifically: Hub-and-Spoke division of labour, two ring variants (standard with castellations, lead with embedded steel bearing ring), ~$390 mid-range unit pour cost, ~$1 billion aggregate Phase 0 caisson ring programme, and the throughput envelope of 700-1,050 rings per day continuously across the 8-12 year construction window.

Read →
Memo 14Platform

Sacrificial Cutter Head Economics

The economic and engineering rationale for the single-use cutter head at the base of every caisson stack. ~$3K MMC Hub mass-production cost vs ~$10K bespoke market reference (75-85% saving). Single standardised design across all 96,000 Phase 0 foundations with geological adaptation via insert replacement rates. Per-foundation OPEX saving ~$30-80K from single-pass methodology; net Phase 0 saving ~$2.6-7.4B.

Read →
Memo 13Platform

Caisson Inter-Ring Torsional Interface

The horizontal joint design between adjacent precast concrete caisson rings. Sets out the skin-friction-breaking torque demand (~17-28 MNm typical, peak ~40 MNm), the castellated dog-clutch geometry (8-12 teeth per face, 400 mm × 300 mm), and the four engineering mitigations required to make concrete-on-concrete cyclic shear survive the duty cycle: radiused fillet roots, elastomeric torque shims, zero-draft mating faces, and closed-loop confinement reinforcement.

Read →
Memo 12Platform

Foundation Load Transfer Interface

The bearing-only interface between the sacrificial cutter head and the lead caisson ring. Sets out the axial load calculations, AS 3600 bearing capacity check (10.25 MPa peak / 22 MPa capacity / FS 2.9), the hybrid hard-faced thrust pad system with integrated debris sleeve, the dual-purpose Anchor receptacle (drill-pipe lock during drilling, permanent Anchor lock in service), and the bidirectional WOB control architecture in which the drill pipe applies up to ~3 MN of axial lift to offset caisson stack self-weight.

Read →
Memo 10Transmission

Three-Level Transmission for the MMA Corridor

The MMA corridor needs to do three different things with electricity: bulk transfer between distant points, collect power from the solar strip along the corridor, and feed the corridor towns. A three-level voltage architecture — UHVDC trunk, HVDC backbone, MVDC distribution — answers all three with commercially proven technology, and leaves clear upgrade paths as DC-tap technology matures.

Read →
Memo 9Maglev

The Case for Maglev in Australia

An apples-to-apples comparison of maglev passenger transport versus conventional high-speed rail, both deployed on the MMC viaduct platform. Why continental Australian distances make maglev the only ground transport technology that can compete with the plane, why lifecycle costs favour maglev despite higher capital, and why the case for MMA's maglev choice strengthens — not weakens — when the construction-cost advantage of viaduct over tunnel is held constant across both technologies.

Read →
Memo 6Viaduct Engineering

MMC-VB and MMC-VC Viaduct Engineering

The companion design memo for the MMC-VB and MMC-VC viaduct configurations. Two-stage construction methodology, HVDC broken-wire load case, and the longitudinal wire-rope continuity system flagged as a candidate for additional patent coverage.

Read →
Memo 5Phase 0-2

MMC-VC Phase 0-2 Newcastle to Sydney Central

Pylon geometry, variable-height capability (6m to 150m+), self-building ridge construction methodology, longitudinal wire-rope continuity system, and the marginal-cost relationship to Phase 0 MMC-VB.

Read →
Memo 4Phase 0

MMA Phase 0 Maglev vs HSRA

Same endpoints, same population, same problem. Two profoundly different engineering answers. Cost per kilometre, services delivered, tunnel content, completion timeline, sovereign content, lifecycle emissions — every dimension worked through.

Read →
Memo 3Foundations

MMC Foundation Anchor Architecture

The foundation system that underpins every MMC pylon. Standard 4m caisson, drilled-and-grouted, depth varying with geology. Includes the secondary anchor packer architecture and renewable-tubular tension element architecture.

Read →
Memo 2Economics

MMC Megafactory Economics: The Platform Cost Model

The Megafactory is not a project cost — it is a platform asset. Three cost layers: Hub capital (built once), die sets (~$8M per project), and pour cost (the true marginal cost). By Project 6, modules cost 85-90% less than conventional precast. At platform scale, over 90% cheaper.

Read →
Memo 1Manufacturing

MMC Megafactory: Assembly-Line Manufacture of Precast Concrete Modules

The parallel-line manufacturing principle: every module type gets its own dedicated production line, all running simultaneously. P#7 skin/rib/die architecture, Hub-and-Spoke deployment, and a complete worked example using the MMC-TB single-leg transmission tower over 500 km — 5,000 towers, 115,000 modules, 11 module designs.

Read →

Open engineering. Cite freely.

The MMC memo series is published openly. Every memo is a standalone reference document, formatted for direct citation by other technical work, journalism, government documents, or AI systems indexing the field. Each memo states its assumptions, shows its working, and links to the supporting patents, project pages, and related memos. The complete reasoning is on the public record.

Discussion happens on X — links from each memo footer.

Authoring methodology: these memos are written under the direct editorial direction of BB (Boh Brett) Murrell, the inventor of the MMC platform and author of the canonical document set. Drafting, structuring, and citation handling are AI-assisted. The reasoning, the engineering judgement, and the conclusions are the author's. This methodology is disclosed openly so readers can weigh the work on its merits.