Working outwards from the town: each town is the hub for a renewable energy region, the towns are linked along the corridor about 100 km apart, and spur corridors link whole desert zones together. The town itself is on the Cities → page.
01The town as a hub
Each town is a hub for renewable energy at scale.
Each town is the hub for a renewable energy region built in concentric rings around it. The town houses the people, workshops and services that build, run and maintain the solar, wind and storage, and the power goes out on the corridor to the cities and the next towns.
One 5 GW standard town hub in concentric rings. The town at the centre (0–2 km), agrivoltaics with crops and grazing animals in the panel shade (2–4 km), PV (4–7 km), CSP towers and wind (7–8.2 km), pumped hydro where the terrain suits. East and west, along the corridor, the PV expands ring by ring: 10 GW at 11.5 km, 15 GW at 14.0 km, 20 GW at 16.1 km. North and south, either side of the city, irrigated farmland expands past the PV, fed from the aqueduct. The corridor runs through the centre to the next towns, and a north–south open lane runs through the town and the farmland. Illustrative.
Town, 0–2 km. The centre of the hub: homes, the square, workshops and services.
Agrivoltaics, 2–4 km. Panels raised high enough for crops to grow and animals to graze in the shade beneath them.
PV, 4–7 km. Rows of solar panels, with access tracks running out from the town.
CSP towers and wind, 7–8.2 km. Fields of mirrors focus sunlight on central towers, whose heat can be stored to generate after dark; wind turbines generate day and night.
Pumped hydro. Upper and lower reservoirs where the terrain suits, storing power for the night.
Extend outward. The 5 GW hub is the standard model. Each new ring adds about 5 GW and about 200 km²: 10 GW at 11.5 km, 15 GW at 14.0 km, 20 GW at 16.1 km, added as demand grows, the same way the town grows ring by ring.
Farmland past the PV. Irrigated farmland, fed from the aqueduct, lies either side of the city and can expand outward past the PV rings, as far as the water allows.
Out on the corridor. The power goes out on the corridor to the cities and the next towns.
Scale, illustrative. The standard model is a 5 GW hub. 200 towns at about 5 GW each make about 1,000 GW. At MMA’s density of about 40 km² of solar per GW, each hub needs about 200 km², which puts the rings out to about 8.2 km around a town 2 km in radius. Assumptions: every ring at the same density; wind and CSP land use differs from PV and is not sized separately. MMA solar sizing →
02Towns along the corridor
Town hubs across the desert.
Further out along the corridor, the towns sit about 100 km apart, each one a hub surrounded by its own solar, agrivoltaics, CSP and wind. Most of the desert between them stays open, with room for every hub to expand.
Four town hubs along the corridor, about 100 km apart, with ranges carrying wind farms and pumped hydro. Town A and Town D are 5 GW standard hubs; Town B is expanded to 10 GW and Town C to 20 GW, as examples. Dashed rings show room to expand to 20 GW. Irrigated farmland, fed from the aqueduct, spreads past the PV on either side of each town. The corridor carries maglev, freight, the aqueduct and HVDC; a north–south open lane runs through each town. Hub rings to scale.
03Transport between towns
One dollar to anywhere.
Transport between towns is key. Every town is on the network: maglev for people, freight for goods, and power, water and fibre. A town is never a dead end.
One dollar to anywhere. The target fare is one dollar. When people need to leave town, they can ride to the beach, the mountains, a capital city, or another continent.
A place to live. A town in the desert is a place to live, not a place people are stuck in.
Across a desert zone, the hubs come first and service the region. PV farming then spreads outwards from every hub until the hubs are in contact. Spur lines are then built off the corridor to harvest more power, each linking to another main line, with their own hubs that grow the same way, and the zone fills out like a leaf. The junctions grow into larger cities.
The Sahara zone in North Africa, with all MMC main lines (spines), corridors and links in the region. Stage 1: 30 hubs on the Trans-Saharan main line, Algiers to Kano, at 5 GW, about 150 GW. Stage 2: PV farming spreads 50 km out from each hub until the hubs are in contact, about 5,900 GW. Stage 3: three spur lines, about 6,100 km in all, add 59 hubs and link to other main lines: west from In Salah to the Atlantic Africa Spine at Laayoune, east from Tamanrasset to the African Spine at Aswan, and south-east from Agadez to the Trans-Sahel Line at Abéché; about 17,500 GW in all. The junctions grow into cities. Spur routes are illustrative. Assumes about 40 km² per GW across the PV farming area.
05A desert zone
The Sahara, Algiers to Kano.
At the scale of a whole desert zone: the MMC Trans-Saharan corridor runs about 3,000 km from Algiers on the Mediterranean to Kano in northern Nigeria. Town hubs sit along it about every 100 km. Water comes in from the south and power goes north to Europe.
The Sahara desert zone on the MMC Trans-Saharan corridor, Algiers to Kano, through Laghouat, Ghardaïa, In Salah, Tamanrasset, In Guezzam, Arlit, Agadez and Zinder. About 3,005 km; 30 town hubs at about 100 km spacing give about 150 GW at the 5 GW standard, or about 600 GW with every hub expanded to 20 GW. The Vision plans the Sahara zone at about 1,000 GW, so the zone needs more hubs, more corridors or larger hubs. Hub symbols not to scale. Illustrative.