Two standard pylons are drilled, stacked and tensioned together, with one cross-beam across their tops. The next portal is 200 m away. The MMC-TA design →

Five steps for one portal. The foundations are drilled ahead; the crane follows and builds both pylons together.

How each caisson is drilled, step by step: Foundation →
Patent coverage: P1 Foundation Core · P4 Architectural Framework · P6 Pole and Tower Architecture · Patent family →