The pipelines go in at deck level on the MMC-VD services deck, 19 m up. Large lines are welded into strings at a launch station; drive rollers along the deck move them, with a push unit at the start: push and drive. Smaller lines come on spools, fed from a lay train on the service rail — the same idea as the subsea lay.
Nothing is lifted pipe by pipe from the ground. Everything reaches the services deck by the service rail, and every line rides the same rollers along the deck. The rollers drive the pipe: drive roller units at intervals grip it and move it along, and a push unit at the launch station starts each string and adds thrust. The rollers stay in place for inspection and repair.
Status: draft. Demonstrative, not detailed design. Joint length, roller spacing, drive positions and station layout are indicative.
Water, gas, liquid fuels and hydrogen run at 0.6–1.0 m on MMC-VD: too large to reel. They go in as welded strings.
The rollers do not only carry the pipe; they move it. A drive roller unit is a motorised roller under the pipe with a pinch roller above it and guide rollers at the sides (view E). Units are spaced along the deck. Each one moves only its own length of string, so no single machine has to push the whole line, and a long string is not pushed hard from one end.
A rough figure, for scale. Assumptions: the 1.0 m water pipe in steel with a 12.7 mm wall, empty, about 310 kg per metre; a friction coefficient of 0.1 for pipe on rollers, the figure used in pipeline design softwareD; a level deck. Then each kilometre of string needs about 31 t of force to move, and a 1% grade adds about 3 t per kilometre. With a drive unit every 100 m, each unit supplies about 3 t. Not checked: traction of each drive roller, load on each roller, and expansion of a long steel string with temperature.
Precedent: in trenchless pipe installation, the welded string is already laid out on rollers and moved along them — pulled into the bore in horizontal directional drillingD, and pushed by a pipe thruster in the Direct Pipe methodE. Driving the pipe with powered rollers along a whole route is an MMC proposal.
Lines small enough to reel come on spools, like the subsea lay method. Published reel limits: steel pipe is reeled up to 20 in, about 0.5 mA; spoolable composite pipe is made up to 8 inB, on spools up to about 16 ft acrossC. On MMC-VD that is the fibre duct, and any smaller line added later.
| Line | Size on MMC-VD (002-08) | Installed by |
|---|---|---|
| Water | 1.0 m | Welded strings, launch station |
| Gas | 0.75 m | Welded strings, launch station |
| Liquid fuels | 0.6 m | Welded strings, launch station |
| Hydrogen | 0.75 m | Welded strings, launch station |
| Fibre | duct 0.5 m | Spools on the lay train |
| Spare | 1.0 m | Either, by the line it carries |
Because every line sits on rollers, a damaged length can be cut out and replaced on the deck, or the line driven back to the launch station. The service rail brings the crew, the pipe and the spools.
The model: MMC-VD and drawing 002-08. The other way to lay pipes on the platform is hung under the freight deck, on MMC-VB.