The Vision · North America: Working Study

North America: a working study.

A proposal for Canada, the United States and Mexico, worked as an example of the MMC vision. North America already has roads, freight rail, pipelines and power grids. The corridor adds high-speed passenger rail and electric freight, and moves water, power, gas and fibre on the same structure. This is a proposal: detailed engineering is required to finalise the routes.

Rivers, farmland, ports, energy and minerals.

Two maps record what exists today. The corridor maps that follow are drawn on the same base.

Map of North America showing the main rivers, cropping regions, rangeland, ports and cities of Canada, the United States and Mexico.
The resource base: main rivers, cropping regions, rangeland, ports and cities. Regions are indicative.
Map of North America showing oil and gas basins, coal basins, large hydro, the four deserts, the Great Plains wind belt and mineral districts.
The resource base: oil and gas basins, coal, large hydro, the four deserts, the Great Plains wind belt and mineral districts. Basins and sites are indicative.

One corridor network; flood water to storage and the deserts.

Routes
47

National routes in the MMC global plan for the three countries, including ten added by this study.

Route length
61,500 km

Routes and cross-border links, measured city to city in straight lines.

Cross-border links
13

Eight between Canada and the United States, five between the United States and Mexico.

Desert town sites
56

On the corridors and on four candidate desert lines inside the four deserts, at 100 km spacing. Indicative.

Flood water is taken off-channel in high-flow events at the points where a corridor crosses a major river. The corridor aqueduct carries it to storage reservoirs and pumped hydro sites. The stored water supplies the new desert towns, the AI compute sites and the cities. Solar generation in the deserts is carried out on the same structure, and the pumped hydro sites store surplus generation.

The solar target in the deserts is 1,000 GW at stage 1 and 2,000 GW at stage 2, on 67 solar hubs: the 56 new town sites and the 11 existing cities inside the deserts. At 40 km² of solar per GW, 1,000 GW across 67 hubs is a hub radius of about 14 km, and 2,000 GW is about 20 km. Each ring is a PV and farming mix; the rings are drawn on the PV / Farming page. The 100 km spacing allows each hub to expand to a 50 km radius. Four candidate desert lines (Reno to Las Vegas, Boise to Reno, Phoenix to Mexicali, Midland to Chihuahua) carry ten of the sites.

Twelve candidate harvest points are marked. Six pumped hydro projects that are licensed by, or in licensing with, the United States Federal Energy Regulatory Commission are marked as examples of storage sites: Eagle Mountain, Goldendale, Swan Lake, Gordon Butte, Seminoe and White Pine.3

Map of the proposed MMC corridor network for North America: trunk routes, flood-harvest points, pumped hydro examples, the four deserts and new desert towns.
The plan: trunk routes thick, other routes thin, candidate flood-harvest points, pumped hydro examples, the four deserts, new desert town sites and candidate desert lines (dashed).

Five east to west, eight north to south.

The trunk routes cross the continent on routes of the network. Times are end to end at 600 km/h for maglev and 1,000 km/h for hyperloop, with no allowance for stops.

Map of five east-west trunk routes across North America with a table of distances and travel times.
East-west trunks: Trans-Canada, Northern, Overland, Route 40 and Sun Belt. Links A to F were added by this study.
Map of eight north-south trunk routes across North America, including Alaska and the Bering Strait branch, with a table of distances and travel times.
North-south trunks: Pacific, Intermountain, Front Range, Central Plains, Mississippi, Great Lakes to Gulf, Atlantic and Alaska, with the branch to the Bering Strait tunnel. Links G to K were added by this study.

Seven services on one structure.

Electricity

North America has six separate grids: Western, Eastern, Texas, Quebec, Alaska and the Mexican national grid. The four main grids operate at 60 Hz and are not synchronised with each other; power passes between them through direct-current ties.1,2 High-voltage direct-current lines on the corridor cross every grid boundary.

Map of the six existing electricity grids of North America with the proposed corridor network crossing their boundaries.
Electricity: the six existing grids, tinted by state and province, with the corridor network over them. Northern Baja California is part of the Western grid.

Gas

Each route carries a gas pipeline. The routes pass through or beside the main basins and reach the export ports on the Gulf, the Atlantic and the Pacific.

Map of the oil and gas basins of North America, gas export ports and the proposed corridor network.
Gas: oil and gas basins, export ports and the corridor network.

Passenger

North America has no continental high-speed passenger network. The corridor carries maglev at 600 km/h, with hyperloop at 1,000 km/h to follow.

Map of the proposed passenger network for North America with a table of city-pair distances and travel times.
Passenger: the network and ten city pairs with distances and times.

Freight

Freight runs on a dedicated electric line on the corridor structure and reaches ports on the Pacific, the Gulf, the Atlantic and the Great Lakes.

Map of the proposed electric freight network for North America with the major ports and rivers.
Freight: the network, the major ports and the main rivers.

Farming

The corridor aqueduct delivers stored flood water along every route. Irrigated farming is opened beside the corridors in the four deserts.

Map of existing cropping regions, the four deserts and the proposed corridor network in North America.
Farming: existing cropping regions, the deserts and the corridor network.

Fibre and compute

Fibre runs the full length of the network and connects the main data-centre regions. New compute sites are placed in the deserts beside the solar generation and the corridor water supply.

Map of the proposed fibre backbone for North America with existing data-centre regions and the deserts.
Fibre and compute: the backbone, existing data-centre regions and the deserts.

Cities

The corridors join the existing cities of the three countries. New towns are placed on the corridors inside the deserts; each takes water, power, gas, fibre, a passenger station and a freight terminal from the corridor.

Map of existing cities on the proposed network and new desert towns in North America.
Cities: existing cities on the network, new desert towns and the 67 solar hubs.

What the maps rest on.

  1. A1. Status. This study is a proposal. Detailed engineering is required to finalise the routes.
  2. A2. Routes. Routes are drawn city to city in straight lines from the MMC global plan. Distances are straight-line; built length is longer.
  3. A3. Added links. Eleven links (A to K) were added by this study to complete the trunk routes: ten national routes and one cross-border link.
  4. A4. Travel times. 600 km/h for maglev and 1,000 km/h for hyperloop over the straight-line distance, with no allowance for stops.
  5. A5. Deserts and towns. Desert outlines are indicative. Town sites are placed at 100 km spacing on routes and on four candidate desert lines inside the deserts. The candidate lines are not counted in the route length. The 11 existing cities inside the deserts are also solar hubs. Solar is sized at 40 km² per GW, the MMC density.
  6. A6. Harvest points. The twelve harvest points are candidates, placed where a corridor crosses a large river. No flow data has been applied.
  7. A7. Pumped hydro. The six projects are examples of sites already in licensing. Their positions are approximate. They are not part of the corridor scheme.
  8. A8. Resource base. Coast, rivers and lakes are from Natural Earth. Cropping regions, rangeland, basins, mineral districts and data-centre regions are indicative.
  9. A9. Grids. Grids are tinted by whole state and province. Texas, Montana, New Mexico and South Dakota are divided between grids in practice.
  1. United States Department of Energy, Office of Electricity, Learn More About Interconnections.
  2. Power Systems Engineering Research Center, Feasibility Assessment of Synchronous Operations of the North American Eastern and Western Interconnections, 2021.
  3. Federal Energy Regulatory Commission, final environmental impact statement, Seminoe Pumped Storage Project; Western States Water Council, Pumped Storage Hydropower; JD Supra, FERC approves 1,200 MW pumped storage project (Goldendale), January 2026.

The national networks are described on the North America network page.