A proposal for Canada, the United States and Mexico, worked as an example of the MMC vision. North America already has roads, freight rail, pipelines and power grids. The corridor adds high-speed passenger rail and electric freight, and moves water, power, gas and fibre on the same structure. This is a proposal: detailed engineering is required to finalise the routes.
Two maps record what exists today. The corridor maps that follow are drawn on the same base.


National routes in the MMC global plan for the three countries, including ten added by this study.
Routes and cross-border links, measured city to city in straight lines.
Eight between Canada and the United States, five between the United States and Mexico.
On the corridors and on four candidate desert lines inside the four deserts, at 100 km spacing. Indicative.
Flood water is taken off-channel in high-flow events at the points where a corridor crosses a major river. The corridor aqueduct carries it to storage reservoirs and pumped hydro sites. The stored water supplies the new desert towns, the AI compute sites and the cities. Solar generation in the deserts is carried out on the same structure, and the pumped hydro sites store surplus generation.
The solar target in the deserts is 1,000 GW at stage 1 and 2,000 GW at stage 2, on 67 solar hubs: the 56 new town sites and the 11 existing cities inside the deserts. At 40 km² of solar per GW, 1,000 GW across 67 hubs is a hub radius of about 14 km, and 2,000 GW is about 20 km. Each ring is a PV and farming mix; the rings are drawn on the PV / Farming page. The 100 km spacing allows each hub to expand to a 50 km radius. Four candidate desert lines (Reno to Las Vegas, Boise to Reno, Phoenix to Mexicali, Midland to Chihuahua) carry ten of the sites.
Twelve candidate harvest points are marked. Six pumped hydro projects that are licensed by, or in licensing with, the United States Federal Energy Regulatory Commission are marked as examples of storage sites: Eagle Mountain, Goldendale, Swan Lake, Gordon Butte, Seminoe and White Pine.3

The trunk routes cross the continent on routes of the network. Times are end to end at 600 km/h for maglev and 1,000 km/h for hyperloop, with no allowance for stops.


North America has six separate grids: Western, Eastern, Texas, Quebec, Alaska and the Mexican national grid. The four main grids operate at 60 Hz and are not synchronised with each other; power passes between them through direct-current ties.1,2 High-voltage direct-current lines on the corridor cross every grid boundary.

Each route carries a gas pipeline. The routes pass through or beside the main basins and reach the export ports on the Gulf, the Atlantic and the Pacific.

North America has no continental high-speed passenger network. The corridor carries maglev at 600 km/h, with hyperloop at 1,000 km/h to follow.

Freight runs on a dedicated electric line on the corridor structure and reaches ports on the Pacific, the Gulf, the Atlantic and the Great Lakes.

The corridor aqueduct delivers stored flood water along every route. Irrigated farming is opened beside the corridors in the four deserts.

Fibre runs the full length of the network and connects the main data-centre regions. New compute sites are placed in the deserts beside the solar generation and the corridor water supply.

The corridors join the existing cities of the three countries. New towns are placed on the corridors inside the deserts; each takes water, power, gas, fibre, a passenger station and a freight terminal from the corridor.

The national networks are described on the North America network page.