The big-build items that sit on and beside the corridor: stations, passing loops, freight ramps and terminals, and the accessories that fit to the structure. Each needs to be included in the global standard, designed once and built from standard parts, so every station and ramp is a configuration of the standard, not a one-off project.
Stopping trains move off the main alignment onto side guideways and ramps. The main guideways and through tracks carry through traffic at line speed (Memo 11). Stations use the same pylons, pylon joints, cross beams and longitudinal beams as the line; what changes is what is laid on the deck.
Side guideways on the outer deck widths with slow switches (~50 km/h) and side guideways of ~0.5–1 km. One platform pair on the maglev deck.
Medium switches (~100–200 km/h), side guideways of ~3–5 km, a platform pair, a concourse at ground level, and a freight terminal.
Full passing-loop layout with multiple side guideways and medium-to-fast switches.
Switches and a side guideway with no platform, so an express can overtake a slower train.
A dedicated ramp each way, off the outer freight track, at ~3–4% gradient, to a ground-level terminal yard.
Ground-level yard beside the corridor for container handling, road access and warehousing. Memo 11 proposes one at each corridor town, about every 100 km.
Diverging switches between the main and side guideways. Bought in from maglev suppliers; their interface to the deck is set by the standard.
Precast platform panels laid on the deck, with platform edge screens.
Lift and stair towers between ground and platform, proposed to be built from stacked standard pylon joints.
Precast panels where the ground is raised to meet a lowered viaduct at a freight terminal.
Freight overhead-line portals, every second pylon on the standard viaduct.
HVDC insulator strings at each pylon and one pipe support per span, at standard positions on the structure.
Stations, ramps and accessories cost money and time when each is designed fresh. Included in the global standard, each is designed once, with standard dimensions and standard interfaces to the structure, made in volume and installed by the same method on every corridor.